[1] Imed Cacem, Slim Hammadi. Approach by Localization and Multiobjective Evolutionary Optimization for Flexible Job -shop Scheduling Problems[J]. IEEE, 2002. [2] Hisao Ishibuchi, Tadahiko Murata, Kyuhung Lee. Relations between conventional scheduling problems and Fuzzy Scheduling Problems[C]. Proceedings of 35th conference on Decision and Control Kobe,Japan,December 1996. [3] Paul M. Stanfield, Russell E. King, Jeff A. Joines Scheduling arrivals to a production system in a fuzzy environment[J].European Journal of Operational Research, 1996,93: 75 -87. [4] T. Liou,M. J. Wang. Ranking fuzzy numbers with integral value[J]. Fuzzy Sets system, 1992,247-255 [5] Tiente Hsu, Remy Dupas, Daniel Jolly, Gilles Goncalves. Evaluation of mutation heuristics for the solving of multiobjective flexible job shop by an evolutionary algorithm[J].IEEE SMC, 2002. [6] Hisashi Tamami ONO, Hajime Murao, Shinzo Kitamura.Modeling and Genetic Solution of a class of Flexible Job Shop Scheduling Problem[J]. IEEE, 2001. [7] Samir Allet. Handling flexibility in a" generalized job shop"with a fuzzy approach[J]. European Journal of Operational Research, 2003,147:312-333. [8] Haoxun Chen, Jurgen Ihlow, Carsten Lehmann A Genetic Algorithm for Flexible job shop scheduling[C]. International conference on robitics & Automation, 1999. [9] Juite wang. Afuzzy scheduling approach for product development projects[J]. European Journal of Operational Research, 2004,152:180-194. [10] Mitsuru Kuroda, Zeng wang. Fuzzy job shop scheduling[J] Int. J. Production Economics, 1996,44: 45-51. [11] 王凌.车间调度及其遗传算法[M].北京:清华大学出版社,2003. |