[1] 王雪青, 郭留洋, 符桃. 基于关键链技术的工程项目进度规划问题研究 [J]. 河北工业大学学报, 2005, 34(6):20-23. [2] 徐哲, 王黎黎. 基于关键链技术的项目进度管理研究综述 [J]. 北京航空航天大学学报, 2011, 24(2): 54-59. [3] Fatemi Ghomi S M T, Teimouri E. Path critical index and activity critical index in PERT networks [J]. European Journal of Operational Research, 2002, 141(1): 147-152. [4] Sedeño-Noda A, Alcaide López de Pablo D, González-Martín C. A network flow-based method to solve performance cost and makespan open-shop scheduling problems with time-windows [J]. European Journal of Operational Research, 2009, 196(1): 140-154. [5] 王强, 李星梅, 乞建勋. 双代号网络中虚工序对时差计算公式的影响与修正 [J]. 系统工程理论与实践, 2008, 28(6): 106-114. [6] 马国丰, 尤建新. 关键链项目群进度管理的定量分析[J]. 系统工程理论与实践, 2007, 27(9): 54-60. [7] Elmaghraby S E. Activity nets: a guided tour through some recent developments [J]. European Journal of Operational Research, 1995, 82(3): 383-408. [8] Chen Y L, Rinks D, Tang K. Critical path in an activity network with time-switch constraints[J]. European Journal of Operational Research, 1997, 100: 122-133. [9] Alcaide D, Chu C B, Kats V, Levener K, Sierksma G. Cyclic multiple-robot scheduling with time-window constraints using a critical path approach [J]. European Journal of Operational Research, 2007, 177(1):147-162. [10] Kats V, Lei L, Levner E. Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints [J]. European Journal of Operational Research, 2008, 187(3): 1196-1211. [11] Yang H H, Chen Y L. Finding the critical path in an activity network with time-switch constraints [J]. European Journal of Operational Research, 2000, 120(3): 603-613. [12] Guerriero F, Talarico L. A solution approach to find the critical path in a time-constrained activity network [J]. Computer & Operations Research, 2010, 37(9):1557-1569. [13] Vanhoucke M. New computational results for the discrete time/cost trade-off problem with time-switch constraints [J]. European Journal of Operational Research, 2005, 165(2): 359-374. [14] 张静文,徐渝. 具有时间转换约束的项目网络分析方法研究[J]. 系统工程理论与实践, 2005, 25(7): 26-34. [15] 张静文,徐渝,何正文. 多种费用下具有时间转换约束的工期费用均衡项目调度研究[J]. 运筹与管理, 2009, 18(3): 78-84. [16] 张静文,徐渝,何正文,柴国荣. 项目调度中的时间-费用权衡问题研究综述[J]. 管理工程学报, 2007, 21(1): 92-97. |