[1] 贾志欣. 排样问题的研究现状与趋势[J]. 计算机辅助设计与图形学学报, 2004, 16(7): 890-97. [2] 阎春平, 宋天峰, 刘飞. 面向可加工性的复杂约束状态下一维优化下料[J]. 计算机集成制造系统, 2010, 16(1): 195-201. [3] 尹震飚, 春平, 刘飞, 曹智慧. 基于零件相似性特征的大规模下料分组优化方法[J]. 计算机辅助设计与图形学学报, 2007, 19(11): 1142-1146. [4] Yanasse H H, Senne E L F. The minimization of open stacks problem: a review of some properties and their use in pre-processing operations[J]. European Journal of Operational Research, 2010, 203: 559-567. [5] Yanasse H H, Lamosa D M. An integrated cutting stock and sequencing problem[J]. European Journal of Operational Research, 2007, 183: 1353-1370. [6] Chandra P, Fisher M L. Coordination of production and distribution planning[J]. European Journal of Operational Research, 1994, 72:503-517. [7] Ertogral K. Multi-item single source ordering problem with transportation cost: Lagrangian decomposition approach[J]. European Journal of Operational Research, 2008, 191: 156-165. [8] Chan F T S, Chung S H, Wadhwa S A. hybrid genetic algorithm for production and distribution [J]. Omega, 2005, 33: 345-355. [9] Gen M, Syarif A. Hybrid genetic algorithm for multi-time period production/distribution planning[J].Computers & Industrial Engineering, 2005, 48: 799-809. [10] Qu W W, Bookbinder J H, Iyogun P. An integrated inventory-transportation system with modified periodic policy for multiple products [J]. European Journal of Operational Research, 1999, 115: 254-269. [11] Zhou S X, Chao Xiuli, Lee C Y. Optimal transportation policies for production/inventory systems with an unreliable and a reliable carrier [J]. Journal of Global Optimization, 2009, 44: 251-271. [12] Bard J F, Nananukul N. A branch-and-price algorithm for an integrated production and inventory routing problem[J]. Computers & Operations Research, 2010, 37: 2202-2217. [13] Fumero F, Vercellis C. Synchronized development of production, inventory, and distribution schedules[J]. Transportation Science, 1999, 33(3): 330-340. [14] Erjavec J, Gradisar M, Trkman P. Assessment of stock size to minimize cutting stock production costs[J]. International Journal of Production Economics, 2012, 135: 170-176. [15] Wongprakornkul S, Charnsethikul P. Optimization based heuristic approaches for solving an integrated one-dimensional cutting stock-transportation problem[J]. Journal of Mathematics and Statistics, 2007, 3: 142-150. [16] Fisher M L. The Lagrangian relaxation method for solving integer programming problems [J]. Management Science, 1981, 27(1):1-18. [17] Held M, Wolfe P, Crowder H P. Validation of subgradient optimization [J]. Mathematical Programming, 1974, 6 (1): 62-88. [18] Gau T, Waïscher G. CUTGEN1: A problem generator for the Standard one-dimensional cutting stock problem[J].European Journal of Operational Research, 1995, 84: 572-579. |