[1] 乞建勋, 赵岫华, 苏志雄."统筹法"网络中经典概念的拓广及应用[J]. 中国管理科学, 2010, 18(1):184-192. [2] Harris R B, Ioannou P G. Scheduling projects with repeating activities[J]. Journal of Construction Engineering and Management, 1998, 124(4): 269-278. [3] Kallantzis A, Soldatos J, Lambropoulos S. Linear versus network scheduling:a critical path comparison[J]. Journal of Construction Engineering and Management, 2007, 133(7): 483-491. [4] Kallantzis A, Lambropoulos S. Correspondence of activity relationships and critical path between time-location diagrams and CPM [J]. Operational Research, 2004, 4(3): 277-290. [5] Yamín R A, Harmelink D J. Comparison of linear scheduling model(LSM) and critical path method(CPM)[J]. Journal of Construction Engineering and Management, 2001, 127(5): 374-381. [6] Arditi D, Tokdemir O B, Suh K. Effect of learning on line-of-balance scheduling[J]. International Journal of Project Management, 2001(19): 265-277. [7] O’Brien J J. VPM scheduling for high-rise buildings[J]. Journal of the Construction Division, ASCE, 1975, 101(CO4), 895-905. [8] RedaR M. RPM: repetitive project modeling[J]. Journal of Construction Engineering and Management, 1990 116(2): 316-330. [9] Mahdi I M, A new LSM approach for planning repetitive housing projects[J]. International Journal of Project Management, 2004, 22: 339-346. [10] 钱昆润, 葛筠圃. 建筑施工组织与计划[M]. 南京:东南大学出版社, 1989. [11] 蒋根谋, 熊燕. 线性计划方法及其应用研究[J]. 华东交通大学学报, 2008, 25(5): 8-11. [12] Harmelink D J, Rowings J E. Linear scheduling model: development of controlling activity path[J]. Journal of Construction Engineering and Management, 1998, 124(4): 263-268. [13] Lucko G, Orozco A A P. Float types in linear schedule analysis with singularity functions[J]. Journal of Construction Engineering and Management, 2009, 135(5): 368-377. [14] Harmelink D J. Linear scheduling model: float characteristics[J]. Journal of Construction Engineering and Management, 2001, 127(4): 255-260. [15] Mattila K G, Abraham D M. Resource leveling of linear schedules using integer linear programming[J]. Journal of Construction Engineering and Management, 1998, 124(3): 232-244. [16] Lucko G. Productivity scheduling method: linear schedule analysis with singularity functions[J]. Journal of Construction Engineering and Management, 2009, 135(4): 246-253. [17] Mattila K G, Park A. Comparison of linear scheduling model and repetitive scheduling method [J]. Journal of Construction Engineering and Management, 2003, 129(1): 56-64. [18] Mattila K G, Abraham D M. Linear scheduling: Past research efforts and future dierctions[J]. Engineering Constrcution and Architectural Management, 1998, 5(3): 294-303. [19] Voester M C, Beliveau Y J, Bafna T. Linear scheduling and visualization[J]. Transportation Research Record, 1992, 32-39. [20] Kallantzis A, Lambropoulos S. Critical path determination by incorporating minimum and maximum time and distance constrains into linear scheduling[J]. Engineering Construction and Architectural Management, 2004, 11(3): 211-222. |