[1] 张新华, 赖明勇, 叶泽.寡头发电商投资阈值与容量选择模型及其分析.中国管理科学, 2010, 18(5):106-111.[2] Murphy F H, Smeers Y. Generation capacity expansion in imperfectly competitive restructured electricity markets[J]. Operations Research, 2005, 53(4):646-661.[3] Dixit A K, Pindyck R S. Investment under uncertainty[M].New Jersey:Princeton University Press, 1994.[4] Botterud A, Korpas M. A stochastic dynamic model for optimal timing of investments in new generation capacity in restructured power systems[J]. Electrical Power and Energy Systems, 2007, 29(2):163-174.[5] Thor B, Fleten S E, Juliussen E. Investment timing and optimal capacity choice for small hydropower projects[J].European Journal of Operational Research, 2008, 190(1):255-267.[6] Wang C H, Min K J. Electric power generation planning for interrelated projects: A real options approach[J].IEEE Transactions on Engineering Management, 2006, 53(2):312-322.[7] 臧宝锋, 胡汉辉, 庄伟钢.双重随机不确定条件下的一次性容量扩展投资[J].管理科学学报, 2007, 10(3):37-43.[8] Grenadier S R. Option exercise games: An application to the equilibrium investment strategies of firms[J]. The Review of FinancialStudies, 2002, 15(3):691-721.[9] 许诺, 文福拴, 黄民翔.基于期权博弈理论的发电投资决策[J].电力系统自动化, 2007, (14):25-30.[10] Zhu Lei, Fan Ying. A real options-based CCS investment evaluation model: Case study of China's power generation sector[J].Applied Energy, 2011, 88:4320-4333.[11] Hassett K A, Metcalf G E. Investment with Uncertain tax policy: Does random tax policy discourage investment[J]. the Economic Journal, 109, 1999(457):372-393.[12] Pindyck R S. The dynamics of commodity sport and futures markets: Aprimer[J].Energy Journal, 2001, 22(3):1-29. |