[1] 蔡晨,万伟. 基于PERT/CPM的关键链管理[J]. 中国管理科学, 2003, 11(6):35-39.[2] 徐玖平, 胡知能, 王緌. 运筹学 (Ⅰ类)[M]. 北京:科学出版社, 2007.[3] Harris R B, Ioannou P G. Scheduling projects with repeating activities[J]. Journal of Construction Engineering and Management, 1998, 124(4): 269-278.[4] Kallantzis A, Lambropoulos S. Correspondence of activity relationships and critical path between time-location diagrams and CPM[J]. Operational Research, 2004, 4(3): 277-290.[5] Kallantzis A, Soldatos J, Lambropoulos S. Linear versus network scheduling: A critical path comparison[J]. Journal of Construction Engineering and Management, 2007, 133(7): 483-491.[6] Yamín R A, Harmelink D J. Comparison of linear scheduling model(LSM) and critical path method(CPM)[J]. Journal of Construction Engineering and Management, 2001, 127(5): 374-381.[7] Arditi D, Tokdemir O B, Suh K. Effect of learning on line-of-balance scheduling[J]. International Journal of Project Management, 2001,19(5): 265-277.[8] O'Brien J J. VPM scheduling for high-rise buildings[J]. Journal of the Construction Division, 1975, 101(4): 895-905.[9] Harmelink D J, Rowings J E. Linear scheduling model: Development of controlling activity path[J]. Journal of Construction Engineering and Management, 1998, 124(4): 263-268.[10] Selinger S. Construction planning for linear projects[J]. Journal of the Construction Division, 1980, 106(2):195-205.[11] Russell A D, Caselton W F. Extensions to linear scheduling optimization[J]. Journal of Construction Engineering and Management, 1988, 114(1): 36-52.[12] Hyari K, EI-Rayes K. Optimal planning and scheduling for repetitive construction projects[J]. Journal of Management and Engineering, 2006, 22(1):11-19.[13] Liu Shushun S, Wang C J. Optimization model for resource assignment problems of linear construction projects[J]. Automation in Construction, 2007, 16(4):460-473.[14] Long L D, Ohsato A. A genetic algorithm-based method for scheduling repetitive construction projects[J]. Automation in Construction, 2009, 18(4):499-511.[15] Zhang Lihui, Qi Jianxun. Controlling path and controlling segment analysis in repetitive scheduling method[J]. Journal of Construction Engineering and Management, 2012, 138(11):1341-1345. |