[1] 王守清, 柯永建. 特许经营项目融资(BOT, PFI和PPP)[M]. 北京:清华大学出版社, 2008.[2] World Bank. Public-Private-Partners reference guide, Version 1.0[R]. Washington D.C.:World Bank, 2012.[3] Zhang W R, Wang Shouqing, et al. Risk management of Shanghai's privately financed Yan'an Donglu tunnels[J]. Engineering, Construction and Architectural Management, 1998, 5(4):399-409.[4] Zhang Xueqing. Win-win concession period determination methodology[J]. Journal of Construction Engineering and Management, 2009, 135(6):550-558.[5] Shen L Y, Wu Y Z. Risk concession model for build/operate/transfer contract projects[J]. Journal of Construction Engineering and Management, 2005, 131(2):211-220.[6] Yu Chenyun, Lam K C, Yung P. Factors that influence the concession period length for tunnel projects under BOT contracts[J]. Journal of Management in Engineering, 2013, 30(1):108-121.[7] 赵立力, 谭德庆, 黄庆. BOT项目的可控制风险研究[J]. 中国管理科学, 2005,13(5):41-45.[8] Shen L Y, Li H, Li Q M. Alternative concession model for build operate transfer contract projects[J]. Journal of Construction Engineering and Management, 2002, 128(4):326-330.[9] 赵立力, 谭德庆. 基于社会效益的BOT项目特许权期决策分析[J]. 管理工程学报, 2009,(2):125-130.[10] Ng S T, Xie Jingzhu, Cheung Y K, et al. A simulation model for optimizing the concession period of public-private partnerships schemes[J]. International Journal of Project Management, 2007, 25(8):791-798.[11] 宋金波, 宋丹荣, 谭崇梅. 垃圾焚烧发电BOT项目特许期决策模型[J]. 中国管理科学, 2013, 21(5):86-93.[12] 王东波, 宋金波, 戴大双, 等.不确定收益下公路BOT项目特许期决策方法研究[J].预测, 2010, 29(2):58-63.[13] Niu Baozhuang, Zhang Jie. Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty[J]. Transportation Research Part E:Logistics and Transportation Review, 2013, 53:1-14.[14] 秦旋. 基于CAPM的BOT项目特许期的计算模型[J]. 管理工程学报, 2005, 19(2):60-63.[15] Tan Zhijia, Yang Hai. The impact of user heterogeneity on road franchising[J]. Transportation Research Part E:Logistics and Transportation Review, 2012, 48(5):958-975.[16] 吕萍, 李晴, 宋吟秋, 等. 考虑运营成本的收费公路Pareto有效BOT合同决策[J]. 系统工程理论与实践, 2015, 35(7):1808-1815.[17] Tan Zhijia, Tan Wei. Pareto-improving toll adjustment for a build operate transfer toll road project with unknown demand[J]. European Journal of Transport and Infrastructure Research, 2014, 14(1):66-81.[18] Lv Junnan, Ye Gui, Liu Wei, et al. Alternative model for determining the optimal concession period in managing BOT transportation projects[J]. Journal of Management in Engineering, 2014, 31(4):04014066.[19] Yu C, Lam K C A decision support system for the determination of concession period length in transportation project under BOT contract[J]. Automation in Construction, 2103, 31:114-127.[20] 谭志加, 杨海, 陈琼. 收费公路项目Pareto有效BOT合同与政府补贴[J]. 管理科学学报, 2013, 16(3):10-20.[21] Efficiency Urit. Serving the community by using the private sector:An introductory guide to public private partnerships[R].Hong Kong:Hong Kong Specical Administrative Region Government,2003. |