[1] Kim K Y, Kim K H. Heuristic algorithm for routing yard-side equipment for minimizing loading times in container terminals[J]. Naval Research Logistics, 2003, 50(5):498-514.[2] Mak K L, Sun D. Scheduling yard cranes in a container terminal using a new genetic approach[J]. Engineering Letters, 2009, 17(4):1-7.[3] Chang Daofang, Jiang Zuhua, Yan Wei, et al. Developing a dynamic rolling-horizon decision strategy for yard crane scheduling[J]. Advanced Engineering Informatics, 2011, 25(3):485-494.[4] 乐美龙,林艳艳,范志强. 基于两阶段启发式算法的多场桥作业调度研究[J]. 武汉理工大学学报,2012,34(1):60-65.[5] Li Wenkai, Goh M, Wu Yong, et al. A continuous time model for multiple yardcrane scheduling with last minute job arrivals[J]. International Journal of Production Economics, 2012, 136(2):332-343.[6] Wu Yong, Li Wenkai, Petering M E H, et.al. Scheduling multiple yard cranes with crane interference and safety distance requirement[J]. Transportation Science, 2015, 49(4):990-1005.[7] 韩晓龙,郎昊. 基于模拟退火算法的场桥调度研究[J]. 广西大学学报(自然科学),2015,40(2):427-435.[8] 范厚明,姚茜,马梦知. 多场桥分区域平衡策划下的集装箱堆场箱位分配问题[J]. 控制与决策,2016,31(9):1603-1608.[9] Chen Lu, Langevin A. Multiple yard cranes scheduling for loading operations in a container terminal[J]. Engineering Optimization, 2011, 43(11):1205-1221.[10] 郑红星,于凯. 基于混合遗传算法的混堆箱区内场桥调度研究[J]. 交通运输系统工程与信息,2013,13(5):150-158.[11] 梁承姬,周聪,鲁渤. 基于集装箱簇的场桥调度模型与算法[J]. 重庆交通大学学报(自然科学版),2015,35(4):1674-0696.[12] 郑红星,董译文,匡海波,等. 考虑倒箱的混堆装船箱区内场桥调度优化[J]. 系统工程理论与实践,2016,36(9):2362-2373.[13] 张笑菊,曾庆成,杨忠振. 基于堆场混合堆存的集装箱码头装船顺序优化模型[J]. 系统工程理论与实践,2016,36(9):2374-2382.[14] Jin Jiangang, Lee D-H, Cao Jinxin. Storage yard management in maritime container terminals[J]. Transportation Science, 2016, 50(4):1300-1313.[15] Lee Y, Hsu N Y. An optimization model for the containerpre-marshalling problem[J]. Computer and Operations Research, 2007, 34(11):3295-3313.[16] 朱明华,程奂翀,范秀敏. 基于定向搜索算法的集装箱堆场翻箱问题[J]. 计算机集成制造系统,2012,18(3):639-644.[17] 周鹏飞,李丕安. 集装箱堆场进口箱翻箱落位仿真分析与启发式优选算法[J]. 系统工程理论与实践,2013,33(12):3145-3155.[18] 邵乾虔,徐奇,边展,等. 考虑了交箱时间不确定性的场桥堆存作业优化[J]. 系统工程理论与实践,2015,35(2):394-405.[19] Amini A, Tavakkoli-Moghaddam R. A bi-objective truck scheduling problem in a cross-docking center with probability of breakdown for trucks[J]. Computers & Industrial Engineering,2016,96:180-191.[20] 张芳芳,牛奔,李丽,等.基于堆场可存储位置动态变化的集卡调度智能优化[J].中国管理科学,2016,24(S1):217-224.[21] 赵金楼,黄金虎,刘馨.集装箱码头的集卡两阶段路径优化研究[J].中国管理科学,2017,25(4):152-157.[22] 郑红星,于凯,李芳芳,等. 考虑外集卡的混堆集装箱码头多场桥调度[J]. 计算机集成制造系统,2014,20(12):3161-3169. |