[1] 周炳海, 沈诚怡. 基于改进齐套零件策略的车辆装配线新型物料配送调度[J]. 系统工程理论与实践, 2018, 38(7): 1870-1876.Zhou Binghai, Shen Chengyi. New material distribution scheduling for vehicle assembly line based on improved complete set of parts strategy[J]. Systems Engineering-Theory & Practice, 2018, 38(7): 1870-1876. [2] Falsafi M, Marchiori I, Fornasiero R. Managing disruptions in inbound logistics of the automotive sector[J]. International Federation of Automatic Control, 2018, 51(11): 376-381. [3] 唐国春, 刘小卉. 运筹学在汽车零部件入厂物流中的应用[J]. 运筹学学报,2015,19(3):123-130.Tang Guochun, Liu Xiaohui. Application of operations research in incoming logistics of auto parts[J]. Operations Research Transactions, 2015,19(3):123-130. [4] 于辉, 陈飞平. 基于供应链协同的汽车制造企业入厂物流模式选择[J]. 系统工程理论与实践, 2011, 31(7): 1230-1239.Yu Hui, Chen Feiping. Selection of inbound logistics mode for automobile manufacturing enterprises based on supply chain collaboration[J]. Systems Engineering-Theory & Practice, 2011, 31(7): 1230-1239. [5] 蒋丽, 梁昌勇. 基于延迟理论的Supply Hub出库调度模型[J]. 系统工程理论与实践, 2015, 35(4): 904-910.Jiang Li, Liang Changyong. Supply hub outbound scheduling model based on delay theory[J]. Systems Engineering-Theory & Practice, 2015, 35(4): 904-910. [6] Li Guo, Lv Fei, Guan Xu. A collaborative scheduling model for the supply-hub with multiple suppliers and multiple manufacturers[J]. The Scientific World Journal, 2014, 2014: 1-12. [7] 马士华, 洪生,黄焜. 基于批量-时间原则的VMI Hub配送柔性[J]. 运筹与管理,2012,21(4): 103-111.Ma Shihua, Hong Sheng, Huang Kun. VMI Hub distribution flexibility based on batch-time principle[J]. Operations Research and Management Science, 2012,21(04): 103-111. [8] 刘秋生, 宋根平. 基于Supply-Hub的三级供应链运作成本优化研究[J]. 管理工程学报,2013(1): 142-146.Liu Qiusheng, Song Genping. Research on optimization of three-tier supply chain operation cost based on Supply-Hub[J]. Journal of Industrial Engineering and Engineering Management, 2013(1): 142-146. [9] 左晓露, 刘志学,郑长征. 汽车零部件循环取货物流模式的分析与优化[J]. 汽车工程, 2011, 133(1): 79-84.Zuo Xiaolu, Liu Zhixue, Zheng Changzheng. Analysis and optimization of the circular pickup flow Mode for auto parts[J]. Automotive Engineering, 2011, 133(1): 79-84. [10] Qiu Xuan, Huang George Q. Transportation service sharing and replenishment/delivery scheduling in Supply Hub in Industrial Park (SHIP)[J]. International Journal of Production Economics,2016, 175: 109-120. [11] 陈飞平. Milk-Run和Supply-Hub集成策略仿真研究[J]. 技术经济, 2009, 28(11): 111-115.Chen Feiping. Research on integrated strategy simulation of Milk-Run and Supply-Hub[J]. Technology Economics, 2009, 28(11): 111-115. [12] Dror M, Trudeau P. Savings by split delivery routing[J]. Transportation Science, 1989, 23(2): 141-145. [13] Dror M, Trudeau P. Split delivery routing[J]. Naval Research Logistics, 1990, 37(3): 383-402. [14] Archetti C, Savelsbergh M W P, Speranza M G. Worst-Case analysis for split delivery vehicle routing problems[J]. Transportation Science,2006,40(2):226-234. [15] 谢秉磊, 胡小明,张一喆. 需求可分的车辆路径问题模型与算法[J].运筹与管理, 2012, 21(3): 72-76.Xie Binglei, Hu Xiaoming, Zhang Yizhe. Model and algorithm for vehicle routing problem with separable demand[J]. Operations Research and Management Science, 2012, 21(3): 72-76. [16] 王旭, 陈栋,王振锋. 汽车零部件Milk-run车辆调度优化模型和算法[J]. 计算机应用,2011, 31(4): 1125-1128, 1132.Wang Xu, Chen Dong, Wang Zhenfeng. Auto parts milk-run vehicle scheduling optimization model and algorithm[J]. Journal of Computer Applications, 2011, 31(4): 1125-1128, 1132. [17] 朱玲, 吴迪. 需求可拆分的汽车零部件循环取货路径优化研究[J]. 计算机应用研究, 2013, 30(6): 1647-1651.Zhu Ling, Wu Di. Research on the optimization of the cyclic pickup route for auto parts with separable demand[J]. Application Research of Computers, 2013, 30(6): 1647-1651. [18] 符卓, 刘文,邱萌. 带软时间窗的需求依订单拆分车辆路径问题及其禁忌搜索算法[J]. 中国管理科学, 2017,25(5): 78-86.Fu Zhuo, Liu Wen, Qiu Meng. Demand-based vehicle routing problem with soft time windows and its tabu search algorithm[J]. Chinese Journal of Management Science, 2017,25(5): 78-86. [19] Peng Tao, Zhou Binghai. Scheduling multiple servers to facilitate just-in-time part-supply in automobile assembly lines[J]. Assembly Automation, 2018, 38(3): 347-360. [20] 吕飞, 马士华. 供应商成本信息不对称下装配系统协同问题研究[J]. 运筹与管理,2017,26(2): 57-67.Lv Fei, Ma Shihua. Research on the coordination problem of assembly system under the condition of supplier cost information asymmetry. Operations Research and Management Science, 2017,26(2): 57-67. [21] Zhang Jie, Peng Jiazhen, Xu Zhiyu. SDVRP model for emergency logstics and evolutionary heuristic approach[C]∥International Conference on Automatic Control and Artificial Intelligence (ACAI 2012), Xiamen, China, March 3-5, 2012. [22] Pureza V, Morabito R, Reimann M. Vehicle routing with multiple deliverymen: Modeling and heuristic approaches for the VRPTW[J]. European Journal of Operational Research, 2012, 218(3): 636-647. [23] 王勇, 赵骅,李勇. 用禁忌算法求解第四方物流作业整合优化模型[J]. 系统工程学报, 2006, 21(2): 143-149.Wang Yong, Zhao Ye, Li Yong. Using tabu algorithm to solve the integrated optimization model of fourth party logistics operation[J]. Journal of Systems Engineering, 2006, 21(2): 143-149. [24] 廖大强, 邬依林,印鉴. 基于禁忌搜索算法的线路规划方案求解[J]. 计算机工程与设计, 2015, 36(5): 1368-1374.Liao Daqiang, Wu Yilin, Yin Jian. Solution of route planning scheme based on tabu search algorithm[J]. Computer Engineering and Design, 2015, 36(5): 1368-1374. [25] Mole R H, Jameson S R. A sequential route-building algorithm employing a generalised savings criterion[J]. Journal of the Operational Research Society, 1976, 27(2): 503-511. [26] 张江华, 李进,高敏刚. 同时集散货物的开放式车辆路径问题研究[J]. 中国管理科学, 2013, 21(4): 187-192.Zhang Jianghua, Li Jing, Gao Mingang. Research on the open vehicle routing problem for simultaneous bulk cargo[J]. Chinese Journal of Management Science, 2013, 21(4): 187-192.
|