[1] |
Tieke Li,Yixuan Su,Wenxin Zhang,Bailin Wang.
Interval Multi-objective Optimal Scheduling for Steelmaking-continuous Casting with Processing Time Uncertainty
[J]. Chinese Journal of Management Science, 2024, 32(8): 95-106.
|
[2] |
Zihao Chu,Zhe Xu,Dongning Liu.
Model and Algorithm on Stochastic Scheduling Problem with Activity Overlapping
[J]. Chinese Journal of Management Science, 2024, 32(7): 84-94.
|
[3] |
Ling Zhang,Pengfei Gao,Lin Zhang.
Research on Emergency Evacuation and Material Allocation Based on Deprivation Cost
[J]. Chinese Journal of Management Science, 2024, 32(5): 187-195.
|
[4] |
Zujun Ma, Yiran Wang.
Optimal Location and Capacity of Pre-cooling Facilities Considering the First-Mile Loss of Fresh Agri-products
[J]. Chinese Journal of Management Science, 2024, 32(2): 315-323.
|
[5] |
Xinyue Zhang,Peng Jin,Xiaoxuan Hu,Moning Zhu.
Research on the Time-dependent Multi-depot Open Vehicle Routing Problem with Time Windows
[J]. Chinese Journal of Management Science, 2024, 32(1): 146-157.
|
[6] |
CHEN Xiao-hong, ZHOU Ming-hui, TANG Xiang-bo.
Research on the Optimal Control Strategy for Pollution Reduction in Winter under the Constraints of Urban Air Quality Targets
[J]. Chinese Journal of Management Science, 2023, 31(3): 1-9.
|
[7] |
MA Zhi-qiang, XU Xiao-feng, HE Zheng-wen, WANG Neng-min.
Robust Scheduling Optimization of Project Resources with Activity Splitting under Complex and Uncertain Environments
[J]. Chinese Journal of Management Science, 2022, 30(3): 117-130.
|
[8] |
FAN Hou-ming, TIAN Pan-jun, LV Ying-chun, ZHANG Yue-guang.
Cross-dock Door Assignment and Vehicle Routing Problem of Considering Temporal-Spatial Distance
[J]. Chinese Journal of Management Science, 2022, 30(2): 137-149.
|
[9] |
PU Xu-jin, LI Xiu-feng.
Multi-objective Low Carbon MDVRP Optimization Based on E-commerce Commitment Delivery Mechanism
[J]. Chinese Journal of Management Science, 2021, 29(8): 57-66.
|
[10] |
XIA Jie, MA Xin, WU Wen-qing.
The Improved FAGM(1, 1) Model Based on Simpson Formula and Its Applications
[J]. Chinese Journal of Management Science, 2021, 29(5): 240-248.
|
[11] |
PENG Wu-liang, MA Xiao-jing.
A Bi-objective Optimization Method for Tactical Project Planning
[J]. Chinese Journal of Management Science, 2021, 29(2): 69-77.
|
[12] |
XU Xian-hao, WANG Qian, ZENG Kuan, PENG Hong-xia.
Study on the Optimal Ordering Policy of Perishable Products with Delayed Payment
[J]. Chinese Journal of Management Science, 2021, 29(2): 108-116.
|
[13] |
XIONG Hao, YAN Hui-li.
Six Location-inventory Models with Risk Pooling in Two-echelon Logistics System
[J]. Chinese Journal of Management Science, 2021, 29(1): 72-81.
|
[14] |
XIANG Yin.
Interdiction Network Design for Preventing Terrorist Invasion with Asymmetric Information
[J]. Chinese Journal of Management Science, 2020, 28(9): 188-198.
|
[15] |
ZHAO Dong-fang, ZHANG Xiao-dong, ZHOU Hong-li.
Multi-manufacturing Cells Collaborative Scheduling Based on Parallel Manufacturing
[J]. Chinese Journal of Management Science, 2020, 28(8): 188-195.
|