LIU Bin, LIU Si-feng, ZHAI Zhen-jie, DANG Yao-guo. Optimum Time Response Sequence for GM(1,1)[J]. Chinese Journal of Management Science, 2003, (4): 54-57.
[1] Deng Ju Long,Iutroduction to Grey system Theory[J].The Journal of Grey System(UK).1989,1(1):1-24. [2] 刘思峰,郭天榜,党耀国.灰色系统理论及其应用[M].北京:科学出版社.1999.1-5. [3] Liu Sifeng,Forrest.J.The role and position of Grey system theory in science development[J].The Journal of Grey System(UK).1997,9(4):351-356. [4] 谭冠军.GM(1,1)模型的背景值构造方法和应用[J].系统工程理论与实践.2000,(4):98-103. [5] Dang Yaoguo,Liu Sifeng,Chen Kejia.The GM model that x(n)be taken as initial value[J].Journal of XiaMen University(Natural Science).2002,41(Sup.):276-277. [6] Liu Si-feng,Lin Yi.An introduction to Grey systems:Foundation,Methodology and Applications[M].Slippery rock,ⅡGSS Academic publisher,1998. [7] Liu Si-feng,Deng Ju-long,The Range Suitable for GM(1,1)[J].The Journal of Grey System(UK).1999,11(1):131-138. [8] 刘思峰,邓聚龙.GM(1,1)模型的适用范围[J].系统工程理论与实践.2000,(5):121-124.