[1] Erenguc SS,Tufekci S,Zappe CJ.Solving time/cost trade-off problem with discounted cash flows using generalized benders decomposition[J].Naval Research Logistics,1993,40(1):25-50. [2] 陈建华,林呜,马士华.基于过程管理的工程项目多目标综合动态调控机理模型[J].中国管理科学,2005,13(5):93-95. [3] De P,Dunne EJ,Ghosh JB and Wells CE.The discrete time/cost trade-off problem revisited[J].European Journal of Operational Research,1995,81(2):225 -238. [4] Vanhoucke M.New computational results for the discrete time/cost trade-offs in project scheduling with timeswitch constraints[J].European Journal of Opcrational Research,2005,165(2):359-374. [5] Sou-sen Leu,An-ting Chen,Chung-huei Yang.A GAbased fuzzy optimal model for construction time-cost tradeoff[J].International Journal of Project management,2001,19(1):47-58. [6] Chen YL,Rinks D,Tang K.Critical path in an activity network with time constraints[J].European Journal of Operational Research,1997,100(1):122-133. [7] Yang HH,Chen YL.Finding the critical path in an activity network with time-switch constraints[J].European Journal of Operational Research,2000,120(3):603-613. [8] 张静文,徐渝.具有时间转换约束的项目网络分析方法研究.系统工程理论与实践,2005,25(7):26-34. [9] Prabuddha D,James D,Jay BG and Charles EW.Complexity of the discrete time-cost tradeoff problem for project networks[J].Operations Research,1997,45 (2):302-306. [10] Alcaraz J,Maroto C,Ruiz R.Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms[J].Jouranl of Operational Research Society,2003,54(3):614-626. [11] 汪嘉旻,孙永广,吴宗鑫.净收益最大化的时间-费用交换问题研究[J].系统工程学报,2000,15(3):267-271. |