[1] Kap Hwan Kim,Young-Man Park.A Crane Scheduling Method for Port Container Terminals[J].European Journal of Operational Research,2004,(156):752-768. [2] Daganzo C.F..The Crane Scheduling Problem[J].Transportation Research,B,1989,23:159-175. [3] W.C.Ng,K.L.Mak.Yard Crane Scheduling in Port Container Terminals[J].Applied Mathematical Modelling,2005,29:263-276. [4] Chuqian Zhang,Yat-wah Wan,Jiyin Liu,Richard J.Linn.Dynamic Crane Deployment in Container Storage Yards[J].Transportation Research,Part B,2002,36:537-555. [5] IFA Vis,R.de Koster,Roodberqen,LWP Peeters.Determination of the Number of Automated Guided Vehicles Required at Semi-automated Container Terminal[J].Journal of Operational Research Society,2001,52:409-417. [6] Gambardella L.M.,Mastrolilli M.,Rizzoli A.E.,Zaffalon M..An Optimization Methodology for Intermodal Terminal Management[J].Journal of Intelligent Manufacturing,2001,(12):521-534. [7] Pasquale Legato,Rina M.Mazza.Berth Planning and Resources Optimization at a Container Terminal via Discrete Event Simulation[J].European Journal of Operational Research,2001,(133):537-547. [8] M.Reiser,S.S.Lavenberg.Mean Value analysis of closed multichain queuing networks[J].Journal of the Association for Computing Machinery,1980,27:313-322. [9] Sanjay K.Bose.An Introduction to Queueing Systems[M].India:Indian Institute of Technology,Kanpur,Kluwer Academic/Plenum Publishers,2001. [10] I.Halachmi,I.J.B.F.Adan.etc.Designing the Optimal Robotic Milking Barn by Applying a Queuing Network Approach[J].Agricultural Systems,2003,(76):681-696. [11] 杨静蕾,丁以中.动态多级排队网络在集装箱码头设备配置中的模拟研究[J].系统仿真学报,2003,8:1069-1073. [12] 丁以中,杨静蕾,等.物流信息与决策技术在港口企业中的应用[P].上海海事大学,交通部,2002,7. |