[1] Hahm J, Yano C A. The economic lot and delivery scheduling problem: the single itemcase [J]. International Journal of Production Economics, 1992, 28(2):235-252. [2] Kim S L, Ha D. A JIT lot-splitting model for supply chain management: enhancing buyer-supplierlinkage [J]. International Journal of Production Economics, 2003, 86(1):1-10. [3] Khouja M. Synchronization in supply chains: implications for design andmanagement [J].Journal of the operational Research Society, 2003, 54(9):984-994. [4] Kreng B, Wang I C. Economical delivery strategies of products in a JIT system under a global supply chain [J]. Int J Adv Manuf Technol, 2005,26:1421-1428. [5] Pundoor G, Chen Zhilong. Joint cyclic production and delivery scheduling in a two-stage supply chain[J]. International Journal of Production Economics, 2009,119(1) :55-74. [6] Low C, Li R K, Chang C M. Integrated scheduling of production and delivery with time windows[J]. International Journal of Production Research, forthcoming. [7] Lee W. A joint economic lot size model for raw material ordering, manufacturing setup, and finished goodsdelivering [J]. Omega, 2005, 33(2): 163-174. [8] Cao Wujun, Hu Yujin, Li Chenggang, et al. Single setup multiple delivery model of JIT system [J]. Int J Adv Manuf Technol, 2007, 33: 1222-1228. [9] Pundoor G. Integrated production-distribution scheduling in supplychains . Maryland: University of Maryland, 2005. [10] Sana S S. A production-inventory model of imperfect quality products in a three-layer supply chain[J]. Decision Support Systems, 2011, 50(2):539-547. [11] Ben-Daya M, As’ad R, Seliaman M. An integrated production inventory model with raw material replenishment considerations in a three layer supply chain[J]. International Journal of Production Economics, forth coming. [12] 马士华,龚凤美,刘凤华.基于集配中心的生产和配送协同决策研究[J].计算机集成制造系统, 2008, 14(12): 2421-2430. [13] 马士华,龚凤美.基于Supply Hub的供应商配送批量协同决策[J].工业工程与管理, 2009, 14(2): 1-9. [14] 关旭, 马士华, 周奇超. 需求时间不确定下的多供应商配套供货模型研究[J].中国管理科学, 2011, 19(2): 79-87. |