[1] Elmaghraby S E. On criticality and sensitivity in activity networks[J]. European Journal of Operational Research, 2000, 127(2):220-238.[2] 李星梅, 张倩, 魏涵静,等. 基于分层网络的机动时间研究[J]. 中国管理科学, 2015, 23(6):147-152.[3] 乞建勋, 李星梅, 王强. 等效子网络的理论与方法[J]. 管理科学学报, 2010, 13(1):40-44.[4] Yang J B, Kao C K. Critical path effect based delay analysis method for construction projects[J]. International Journal of Project Management, 2012, 30(3):385-397.[5] 李星梅, 乞建勋, 苏志雄. 基于时差分析的资源均衡问题研究[J]. 中国管理科学, 2007, 15(1):47-54.[6] Hegazy T, Wassef N. Cost optimization in projects with repetitive nonserialactivities[J]. Journal of Construction Engineering and Management, 2001, 127(3):193-191.[7] 蔡晨, 万伟. 基于PERT/CPM的关键链管理[J]. 中国管理科学, 2003, 11(6):35-39.[8] Zhang Lihui, Pan Chuyun, Zou Xin. Criticality comparison between the repetitive scheduling method and the network model[J]. Journal of Construction Engineering and Management, 2013, 139(10).[9] 张立辉, 邹鑫, 乞建勋. 考虑软逻辑的重复性项目离散时间费用权衡问题[J]. 系统工程学报, 2013, 28(4):554-561.[10] Harris R B, Ioannou P G. Scheduling projects with repeating activities[J]. Journal of Construction Engineering and Management, 1998, 124(4):269-278.[11] Zhang Lihui, Qi Jianxun. Controlling path and controlling segment analysis in repetitive scheduling method[J]. Journal of Construction Engineering and Management, 2012,138(11):1341-1345.[12] Ammar M. Integrated LOB and CPM method for scheduling repetitive projects[J]. Journal of Construction Engineering and Management, 2013, 139(1):44-50.[13] ChrzanowskiJr E N, Johnston D W. Application of linear scheduling[J]. Journal of Construction Engineering and Management, 1986, 112(4):476-491.[14] Harmelink D J, Rowings J E. Linear scheduling model:development of controlling activity path[J]. Journal of Construction Engineering andManagement, 1998, 124(4):263-268.[15] Harmelink D J. Linear scheduling model:The development of a linear scheduling model with microcomputer applications for highway construction control[D]. Ames:Iowa State University, 1995.[16] Ammar M. Float analysis of non-serial repetitive activities[J]. Construction Management and Economics, 2003, 21(5):535-542.[17] Lucko G. Productivity scheduling method:linear schedule analysis with singularity functions[J]. Journal of Construction Engineering and Management, 2009, 135(4):246-253.[18] Lucko G, Orozco A. Float types in linear schedule analysis with singularity functions[J]. Journal of Construction Engineering and Management, 2009135(4):368-377.[19] 张立辉, 邹鑫, 乞建勋. 通过延迟阶跃函数求解重复性项目控制路线的方法研究[J]. 中国管理科学, 2013, 21(3):118-126.[20] Kallantzis A, Lambropoulos S. Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling[J]. Engineering, Construction and Architectual Management, 2004, 11(3):211-222. |