[1] [美] Ulrich和Eppinger著. 杨青等译. 产品设计与开发(第6版)[M]. 北京:机械工业出版社, 2018.[2] Costantino F, Gravio G D, Nonino F. Project selection in project portfolio management:An artificial neural network model based on critical success factors[J]. International Journal of Project Management, 2015, 33(8):1744-1754.[3] 李星梅, 魏涵静, 郭晓玲,等. 基于可打断的双目标项目组合选择模型研究[J]. 中国管理科学, 2014, 22(11):154-157.[4] 陶莎, 盛昭瀚, 朱建波. 交互作用不确定下的项目组合选择鲁棒决策[J]. 中国管理科学, 2017, 25(4):190-196.[5] Dickinson M W, Thornton A C, Graves S. Technology portfolio management:optimizing interdependent projects over multiple time periods[J]. IEEE Transactions on Engineering Management. 2001, 48(4):518-527.[6] Stummer C, Heidenberger. Interactive R&D portfolio analysis with project interdependencies and time profiles of multiple objectives[J]. IEEE Transactions on Engineering Management, 2003, 50(2):175-183.[7] Stewart T J. Multiple objective project portfolio selection based on reference points[J]. Journal of Business Economics. 2016, 86(1-2):23-33.[8] Magalhães M, Íscar Afonso. A multi-sector growth model with technology diffusion and networks[J]. Research Policy, 2017,46(7):1340-1359.[9] Wydra S. Challenges for technology diffusion policy to achieve socio-economic goals[J]. Technology in Society. 2015,5(41):76-90.[10] Jin W. International technology diffusion, multilateral R&D coordination, and global climate mitigation[J]. Technological Forecasting & Social Change. 2016, 102:357-372.[11] 周汶霏, 宁继鸣. 社会网络分析视角下的创新项目扩散研究——以孔子学院为例[J]. 中国软科学, 2017(5):56-65.[12] Aerts G, Dooms M, Haezendonck E. Knowledge transfers and project-based learning in large scale infrastructure development projects:an exploratory and comparative ex-post analysis[J]. International Journal of Project Management, 2016, 35(3):224-240.[13] Scholz M, Pfeiffer J, Rothlauf F. Using PageRank for non-personalized default rankings in dynamic markets[J]. European Journal of Operational Research. 2017, 260(1):388-401.[14] 任晓龙, 吕琳媛. 网络重要节点排序方法综述[J].科学通报, 2014,(13):1175-1197.[15] Garas A, Schweitzer F, Havlin S. A k-shell decomposition method for weighted networks[J]. New Journal of Physics, 2012, 14(8)1-14.[16] Brin S, Page L. The anatomy of a large-scale hypertextual Web search engine[J]. Computer Networks, 2013, 30(1-7):107-117.[17] Agryzkov T, Oliver J L, Tortosa L, et al. An algorithm for ranking the nodes of an urban network based on the concept of PageRank vector[J]. Applied Mathematics & Computation, 2012, 219(4):2186-2193.[18] Browning T R. Design structure matrix extensions and innovations:A survey and new opportunities[J]. IEEE Transactions on Engineering Management, 2016, 63(1):27-52.[19] 杨青,吕佳芮,索尼亚. 基于设计结构矩阵(DSM)的复杂研发项目建模与优化研究进展,系统工程理论与实践, 2016, 36(4):989-1002.[20] 杨颖, 杨善林, 胡小建. 基于战略一致性的新产品开发项目组合选择[J]. 系统工程理论与实践. 2014, 34(4):964-970.[21] Aerts G, Dooms M, Haezendonck E. Knowledge transfers and project-based learning in large scale infrastructure development projects:an exploratory and comparative ex-post analysis[J]. International Journal of Project Management, 2016, 35(3):224-240.[22] Nieto M, Lopéz F, Cruz F. Performance analysis of technology using the S curve model:the case of digital signal processing (DSP) technologies[J]. Technovation, 1998, 18(6-7):439-457.[23] Aarseth W, Ahola T, Aaltonen K. Project sustainability strategies:A systematic literature review[J]. International Journal of Project Management, 2016, 35(6),1071-1083.[24] Sosa M E. Realizing the need for rework:from task interdependence to social networks[J]. Production & Operations Management, 2015, 23(8):1312-1331.[25] Batallas D A, Yassine A A. Information leaders in product development organizational networks:social network analysis of the design structure matrix[J]. IEEE Transactions on Engineering Management, 2006, 53(4):570-582.[26] Koh E C Y, Caldwell N H M, Clarkson P J. A method to assess the effects of engineering change propagation[J]. Research in Engineering Design, 2012, 23(4):329-351.[27] Meo P D, Ferrara E, Fiumara G. A novel measure of edge centrality in social networks[J]. Knowledge-Based Systems, 2012, 30(30):136-150. |