[1] 刘铭,赵保军,杨建军,等.基于GA和BP融合算法的装备费用估算方法[J].系统工程与电子技术,2002,24(2):62-65. [2] Deng S, Yeh Tsung-Han. Using least squares support vector machines for the airframe structures manufacturing cost estimation[J]. International Journal of Production Economics, 2011,131(2):701-708. [3] Curran R, Castagne S, Early J. Aircraft cost modelling using the genetic causal technique within a systems engineering approach[J]. Aeronautical Journal,2007, 111(21):409-420. [4] Lin T, Lee J W, Lwin T. Integrated approach for rotor blade manufacturing cost estimate[J]. Aircraft Engineering and Aerospace Technology, 2011,83(4):235-244. [5] Hart C G, He Z, Sbragio R, et al. An advanced cost estimation methodology for engineering systems[J]. Systems Engineering,2012,15(1):28-40. [6] Trivailo O, Sippel M, Sekercioglu V A. Review of hardware cost estimation methods,models and tools applied to early phases of space mission planning[J]. Progress in Aerospace Science, 2012,53:1-17. [7] 何莎伟,刘思峰,方志耕.基于I-GM(0,N)模型的干线客机价格预测方法[J].系统工程理论与实践,2012,32(8):1761-1707. [8] 杨青,汪亮,叶定友,等.一种改进的导弹费用估算方法[J].系统工程与电子技术,2002,24(4):12-15. [9] 孙兆辉,白思俊,刘丽华.基于聚类分析和灰色模型的固体火箭发动机价格模型研究[J].系统工程理论与实践,2005,25(8):114-118. [10] 韩晓明,姜科,张琳,等. 基于灰色神经网络武器装备研制费用预测模型[J].现代防御技术,2011,39(4):184-188. [11] 顾晓辉,王晓鸣.残差修正的弹箭系统研制费用估算模型研究[J].系统工程与电子技术,2003,25(6):60-61. [12] 戴华.矩阵论[M].北京:科学出版社, 2001. [13] 刘建.航天型号寿命周期费用估算及报价系统研究与实现[D].长沙:国防科学技术大学, 2004. |