[1] Fan Suling. Modified time impact analysis method[J]. Journal of Construction Engineering and Management, 2012, 138(2):227-233. [2] Hegazy T, Menesi W. Delay analysis under multiple baseline updates[J]. Journal of Construction Engineering and Management, 2008, 134(8):575-582. [3] Ahsan K, Gunawan I. Analysis of cost and schedule performance of international development projects[J]. International Journal of Project Management, 2010, 28(1):68-78. [4] Han S H, Yun S, Kim H, et al. Analyzing schedule delay of mega project:Lessons learned from Korea train express[J]. IEEE Transactions on Engineering Management, 2009, 56(2):243-256. [5] Alkass S, Mazerolle M, Harris F. Construction delay analysis techniques[J]. Construction Management and Economics, 1996, 14(14):375-394. [6] Ndekugri I, Braimah N, Gameson R. Delay analysis within construction contracting organizations[J]. Journal of Construction Engineering and Management, 2008, 134(9):21-32. [7] Lovejoy V A. Claims schedule development and analysis:Collapsed as-built scheduling for beginners[J]. Cost Engineering, 2004, 46(1):27-30. [8] Braimah N, Ndekugri I. Consultants' perceptions on construction delay analysis methodologies[J]. Journal of Construction Engineering and Management, 2009, 135(12):1279-1288. [9] Mohan S B, Al-Gahtani K S. Current delay analysis techniques and improvements[J]. Cost Engineering, 2006, 48(9):12-21. [10] 陈勇强, 张水波. 国际工程索赔[M]. 北京:中国工业出版社, 2008. [11] Zack J G. But-for schedules-analysis and defense[J]. Cost Engineering, 2001, 43(8):13-17. [12] Hegazy T, Zhang Kehui. Daily windows delay analysis[J]. Journal of Construction Engineering and Management, 2005, 131(5):505-512. [13] Kumaraswamy M, Yogeswaran K. Substantiation and assessment of claims for extensions of time[J]. International Journal of Project Management, 2003, 21(1):27-38. [14] Society of Construction Law. The society of construction law delay and disruption protocol[M]. England:Society of Construction Law, 2002. [15] Kim K, Kim Y, Shin D. Delay analysis method using delay section[J]. Journal of Construction Engineering and Management, 2005, 131(11):1155-1164. [16] Shi J J, Cheung S O, Arditi D. Construction delay computation method[J]. Journal of Construction Engineering and Management, 2001, 127(1):60-65. [17] 郭汉丁, 郑丕谔, 郝海. 工期索赔分析中网络计算的叠加和发散效应[J]. 西安建筑科技大学学报(自然科学版), 2003, 35(1):56-62. [18] Hobb L J. Evaluating CPM reliability:A linguistic approach[J]. Cost Engineering, 2006, 48(3):22-26. [19] Zhao Tong, Tseng C L. A note on activity floats in activity-on-arrow networks[J]. Journal of the Operational Research Society, 2003, 54(12):1296-1299. [20] 乞建勋,李星梅,王强.等效子网络的理论与方法[J].管理科学学报,2010,13(1):40-44. [21] 张立辉,乞建勋.CPM网络节点时差的特性与应用[J].中国管理科学,2008, 16(5):128-133. [22] Gong D, Hugsted R. Time-uncertainty analysis in project networks with a new merge-event time-estimation technique[J]. International Journal of Project Management, 1993, 11(3):165-173. [23] Gong Daji. Optimization of float use in risk analysis-based network scheduling[J]. International Journal of Project Management, 1997, 15(3):187-192. [24] Stumpf G R. Schedule delay analysis[J]. Cost Engineering, 2000, 42(7):32-43. [25] Garza J M D L, Kim K. Critical path method with multiple calendars[J]. Journal of Construction Engineering and Management, 2005, 131(3):330-342. [26] Al-Gahtani K S, Al-Sulaihi I A, Iqupal A. Total float management:Computerized technique for construction delay analysis[J]. Canadian Journal of Civil Engineering, 2016, 43(5):391-401. |