[1] Herroelen W,Leus R.Project scheduling under uncertainty:Survey and research potentials[J].European Journal of Operational Research,2005,165(2):289-306. [2] 汪嘉旻,孙永广,吴宗鑫.时间和费用具有不确定性的优化进度计划[J].系统工程理论与实践,2002,22(1):93-98. [3] Herroelen W,Leus R.The construction ofstable project baseline schedules[J].European Journal of Operational Research,2004,156(3):550-565. [4] Van de Vonder S,Demeulemeester E,Herroelen W,et al.The use of buffers in project management:The trade-off between stability and makespan[J].International Journal of Production Economics,2005,97(2):227-240. [5] Al-Fawzan M A,Haouari M.A bi-objectivemodel for robust resource-constrained project scheduling[J].International Journal of Production Economics,2005,96(2):175-187. [6] Lambrechts O,Demeulemeester E,Herroelen W.A tabu search procedure for developing robust predictive project schedule[J].International Journal of Production Economics,2008,111(2):493-508. [7] Hazır Ö,Haouari M,Erel E.Robust scheduling and robustness measures for the discrete time/cost trade-off problem[J].European Journal of Operational Research,2010,207(2):633-643. [8] 寿涌毅,王伟.基于鲁棒优化模型的项目调度策略遗传算法[J].管理工程学报,2009,23(4):148-152. [9] 何正文,刘人境,徐渝.基于随机活动工期的资源约束项目鲁棒性调度优化[J].系统工程理论与实践,2013,33(3):650-659. [10] 崔南方,梁洋洋,赵雁.考虑鲁棒性的Max-npv项目调度问题[J].系统工程理论与实践,2016,36(6):1462-1471. [11] 王建军,刘晓盼,刘锋.随机机器故障下加工时间可控的并行机鲁棒调度[J].中国管理科学,2017,25(3):137-146. [12] 陶莎,盛昭瀚,朱建波.交互作用不确定下的项目组合选择鲁棒决策[J].中国管理科学,2017,25(4):190-196. [13] Chakrabortty R K,Sarker R A,Essam D L.Resource constrained project scheduling with uncertain activity durations[J].Computers & Industrial Engineering,2017,112:537-550. [14] Bruni M E,Pugliese L D P,Beraldi P,et al.An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations[J].Omega,2017,71:66-84. [15] 崔南方,梁洋洋.基于资源流网络与时间缓冲集成优化的鲁棒性项目调度[J].系统工程理论与实践,2018,38(1):102-112. [16] 孟明辉,周传德,陈礼彬,等.工业机器人的研发及应用综述[J].上海交通大学学报,2016,50:98-101. [17] Li H,Womer K.Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm[J].Journal of Scheduling,2009,12(3):281-298. [18] 黄敏镁,罗荣桂.柔性资源约束下的产品开发项目优化调度研究[J].管理工程学报,2010,24(4):143-147. [19] 王一帆,刘士新,陈迪.求解多技能人力资源约束的项目调度问题的两阶段算法[J].东北大学学报(自然科学版),2014,35(2):184-189. [20] Correia I,Saldanha-da-Gama F.The impact of fixed and variable costs in a multi-skill project scheduling problem:an empirical study[J].Computers& Industrial Engineering,2014,72:230-238. [21] Almeida B F,Correia I,Saldanha-da-Gama F.Priority-based heuristics for the multi-skill resource constrained project scheduling problem[J].Expert Systems with Applications,2016,57:91-103. [22] 李明,徐哲.基于均衡优化的项目多技能人力资源指派与调度方法[J].工业工程,2016,19(1):108-114. [23] 任逸飞,陆志强.多技能资源投入项目调度问题的建模与优化[J].同济大学学报(自然科学版),2017,45(11):1713-1721. [24] 陈蓉,梁昌勇,叶春森,等.考虑随机离职的新产品研发项目组合多技能员工调度模型[J].系统工程理论与实践,2018,38(1):164-176. [25] Myszkowski P B,Olech Ł P,Laszczyk M,et al.Hybrid differential evolution and greedy algorithm (DEGR)for solving multi-skill resource-constrained project scheduling problem[J].Applied Soft Computing,2018,63:1-14. [26] Wang Ling,Zheng Xiaolong.A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem[J].Swarm and Evolutionary Computation,2018,38:54-63. [27] Blazewicz J,Lenstra J K,Rinnooy K A H G.Scheduling subject to resource constraints:Classification and complexity[J].Discrete Applied Mathematics,1983,5(1):11-24. [28] 张汉鹏,邱菀华.资源约束下多项目调度的改进遗传算法[J].中国管理科学,2007,15(5):78-82. [29] 丁雪枫,尤建新.多模式资源受限项目调度问题的混合优化算法研究[J].中国管理科学,2012,20(s1):154-159. |