[1] Tian Ye, Sun Miao, Ye Zuoliang, et al. Expanded models of the project portfolio selection problem with loss in divisibility[J]. Journal of the Operational Research Society,2016,67(8):1097-1107. [2] Zhang Xiaoxiong, Hipel K W, Tan Yuejin. Project portfolio selection and scheduling under a fuzzy environment[J]. Memetic Computing,2019(3):1-16. [3] Siew R Y J. Integrating sustainability into construction project portfolio management[J]. KSCE Journal of Civil Engineering,2016,20(1):101-108. [4] Lopes Y G, Almeida A T D. Assessment of synergies for selecting a project portfolio in the petroleum industry based on a multi-attribute utility function[J]. Journal of Petroleum Science & Engineering,2015, 126:131-140. [5] Yang Mingfen, Lin Yi. Applying fuzzy multi-objective linear programming to project management decisions with the interactive two-phase method[J]. Computing &Industrial Engineering,2013,66(4):1061-1069. [6] Yu L, Wang Shouyang, Wen Fenghua, et al. Genetic algorithm-based multi-criteria project portfolio selection[J]. Annals of Operations Research, 2012,197(1):71-86. [7] Brčić, Katić M, Hlupić M, et al. Planning horizons based proactive rescheduling for stochastic resource-constrained project scheduling problems[J]. European Journal of Operational Research, 2019, 273(1):58-66. [8] 李星梅,魏涵静,乞建勋,等.资源约束下可打断项目组合选择模型研究[J]. 中国管理科学, 2016,24(11):40-45. Li Xingmei, Wei Hanjing, Qi Jianxun, et al. Research on project portfolio selection model with divisibility and resource constraints[J]. ChineseJournal of Management Science,2016,24(11):40-45. [9] Belenky A S. A Boolean programming problem of choosing an optimal portfolio of projects and optimal schedules for them by reinvesting within the portfolio the profit from project implementation[J]. Applied Mathematics Letters,2012,25(10):1279-1284. [10] Chu Zihao, Xu Zhe, Xie Fang. Experimental evaluation of overlapping strategy for the multimode resource-constrained project scheduling problem[J]. Arabian Journal for Science & Engineering,2019,44(3):2503-2517. [11] 李星梅, 张又中, 和远舰. 求解非线性项目组合选择问题的多种线性化技术比较研究[J]. 中国管理科学, 2016,24(S1):236-241. Li Xingmei, Zhang Youzhong, He Yuanjian. Comparing multiple linearization techniques of solving nonlinear project portfolio selection problem with interdependency[J]. ChineseJournal of Management Science,2016,24(S1):236-241. [12] 许浪. 多阶段项目投资组合的风险决策模型[D]. 贵阳:贵州大学, 2016. Xu Lang. Risk decision model of multistage project portfolio[D].Guizhou:Guizhou University,2016. [13] 张得志,詹庆雯,倪楠. 基于实物期权的物流园区规模与建设时机研究[J]. 铁道科学与工程学报, 2018, 12(3):83-87. Zhang Dezhi, Zhan Qingwen, Ni Nan. Research on the investment timing and size of logistics park based on a real option[J]. Journal of Railway Science and Engineering,2018,12(3):83-87. [14] Tofighian A A, Moezzi H, Barfuei M K, et al. Multi-period project portfolio selection under risk considerations and stochastic income[J]. Journal of Industrial Engineering International,2018,14(3):571-584. [15] Alvarez-García B,Fernández-Castro A S. A comprehensive approach for the selection of a portfolio of interdependent projects. An application to subsidized projects in Spain[J]. Computers & Industrial Engineering, 2018,118(4):153-159. [16] 陶莎, 盛昭瀚, 朱建波. 交互作用不确定下的项目组合选择鲁棒决策[J]. 中国管理科学, 2017,25(4):193-199. Tao Sha, Sheng Zhaohan, Zhu Jianbo. Robust decision-making of project portfolio selection with uncertain project interactions[J]. Chinese Journal of Management Science,2017,25(4):193-199. [17] Jafarzadeh M, Tareghian H R, Rahbarnia F, et al. Optimal selection of project portfolios using reinvestment strategy within a flexible time horizon[J]. European Journal of Operational Research,2015,243(2):658-664. [18] Liu Yongjun, Zhang Weiguo. Flexible time horizon project portfolio optimization with consumption and risk control[J].Applied Soft Computing,2019,76(3):282-293. [19] 赵天翊. 不确定环境下的项目选择与排序问题研究[D]. 北京:北京科技大学, 2017. Zhao Tianyi. Research on project portfolio and scheduling problem under uncertain environment[D]. Beijing:University of Science and Technology Beijing,2017. [20] Guo Yuntao, Wang Lin, Li Suike, et al. Balancing strategic contributions and financial returns:a project portfolio selection model under uncertainty[J]. Soft Computing, 2018,22(1):5547-5559. [21] 贺晓波,张硕,王冬梅,等. 基于实物期权定价方法的林业碳汇项目投资决策仿真研究[J]. 运筹与管理,2019,28(2):139-145. He Xiaobo,Zhang Shuo,Wang Dongmei, et al.Research on investment decision-making design and simulation offorestry carbon sequestration project basedon real option pricing theory[J]. Operations Research and Management Science,2019,28(2):139-145. [22] 马彬, 牛东晓. 考虑资产全寿命周期阶段的电网投资决策方法[J]. 水电能源科学, 2019, 37(1):187-190. Ma Bin, Niu Dongxiao. Power grid investment decision method considering life cycle of assets[J]. International Journal Hydroelectric Energy,2019,37(1):187-190. [23] Andalib M S, Tavakolan M, Gatmiri B. Modeling managerial behavior in real options valuation for project-based environments[J]. International Journal of Project Management, 2018, 36(4):600-611. [24] 王喜平,李崇烨. 碳交易机制下风电项目投资决策研究[J]. 电力科学与工程,2018,34(7):25-31. Wang Xiping, Li Chongye. Research on investment decision of wind power project under carbon trading scheme[J]. Electric Power Science and Engineering,2018,34(7):25-31. [25] Li Xingmei, Fang Shu-Cherng, Tian Ye, et al. Expanded model of the project portfolio selection problem with divisibility, time profile factors and cardinality constraints[J]. Journal of the Operational Research Society,66(7):1132-1139. |