FENG Jing-chun, DONG Ling-li. Construction Period-Cost Optimization of Program Based on Critical Chain Method under Multi-Resource Constraints[J]. Chinese Journal of Management Science, 2022, 30(4): 132-143.
[1] Gray R J. Alternative approaches to programme management[J]. International Journal of Project Management, 1997,15(1):5-9. [2] Ferns D C. Developments in programme management[J]. International Journal of Project Management, 1991,9(3):148-156. [3] Thiry M. Combining value and project management into an effective programme management model[J]. International Journal of Project Management, 2002,20(3):221-227. [4] Shehu Z, Akintoye A. Construction programme management theory and practice: Contextual and pragmatic approach[J]. International Journal of Project Management, 2009,27(7):703-716. [5] Rijke J, van Herk S, Zevenbergen C, et al. Adaptive programme management through a balanced performance/strategy oriented focus[J]. International Journal of Project Management, 2014,32(7):1197-1209. [6] Tavana M, Abtahi A, Khalili-Damghani K. A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems[J]. Expert Systems with Applications, 2014,41(4, Part 2):1830-1846. [7] Kim K, Walewski J, Cho Y. Multiobjective construction schedule optimization using modified niched Pareto genetic algorithm[J]. Journal of Management in Engineering, 2015,32:4015038. [8] Altuwaim A, El-Rayes K. Optimizing the scheduling of repetitive construction to minimize interruption cost[J]. Journal of Construction Engineering and Management, 2018,144(7):4018051. [9] 何正文, 刘人境, 胡信布. 基于合同双方交互作用的项目调度优化[J]. 管理科学学报, 2014,17(8):48-59.He Zhengwen, Liu Renjing. Hu Xinbu, Project scheduling optimization based on interaction between two partiesof contracts[J]. Chinese Journal of Management Science, 2014,17(8):48-59. [10] 苏菊宁, 蒋昌盛, 刘晨光, 等. 基于奖惩机制的建筑供应链工期协调优化研究[J]. 中国管理科学, 2010,18(1):95-101.Su Juning, Iang Changsheng, Liu Chenguang,et al. Research on project duration coordination and optimization of construction supplychain based on bonus-penalty mechanism[J].Chinese Journal of Management Science, 2010,18(1):95-101. [11] 张静文, 徐渝, 何正文. 具有时间转换约束的离散时间-费用权衡问题研究[J]. 中国管理科学, 2006,14(2):58-64.Zhang Jingwen, Xu Yu, He Zhengwen. Discrete time/cost trade-offs in Project scheduling with time-switch constraints[J].Chinese Journal of Management Science, 2006,14(2):58-64. [12] 丰景春, 张跃, 丰慧, 等. 子网络视角下项目群合同项目工期延误诊断模型研究[J]. 中国管理科学, 2019,27(10):189-197.Feng Jingchun, Zhang Yue, Feng Hui, et al. Research on the schedule delay diagnosis model of the contract itemfor program from the perspective of sub-network[J].Chinese Journal of Management Science, 2019,27(10):189-197. [13] 郑传斌, 鹿倩倩, 黄洁仙, 等. 子网络视角下大型工程项目群工期压缩模型研究[J]. 软科学, 2018,32(10):124-129.Zheng Chuanbin, Lu Qianqian, Huang Jiexian, et al. Study on program’s duration compression model of large-scale projects from the perspective of sub-network[J].Soft Science, 2018,32(10):124-129. [14] Be瘙塂ikci U, Bilge , Ulusoy G. Multi-mode resource constrained multi-project scheduling and resource portfolio problem[J]. European Journal of Operational Research, 2015,240(1):22-31. [15] Be瘙塂ikci U, Bilge , Ulusoy G. Resource dedication problem in a multi-project environment[J]. Flexible Services and Manufacturing Journal, 2013,25(1):206-229. [16] Salemi Parizi M, Gocgun Y, Ghate A. Approximate policy iteration for dynamic resource-constrained project scheduling[J]. Operations Research Letters, 2017,45(5):442-447. [17] Heimerl C, Kolisch R. Scheduling and staffing multiple projects with a multi-skilled workforce[J]. OR Spectrum, 2010,32(2):343-368. [18] Vanhoucke M. Work continuity constraints in project scheduling[J]. Journal of Construction Engineering and Management, 2006,132(1):14-25. [19] Rebai A. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems[J]. Applied Mathematics & Computation, 2008,195(1). [20] Asta S, Karapetyan D, Kheiri A, et al. Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem[J]. Information Sciences, 2016,373:476-498. [21] Kumar M, Mittal M L, Soni G, et al. A hybrid TLBO-TS algorithm for integrated selection and scheduling of projects[J]. Computers & Industrial Engineering, 2018,119:121-130. [22] Long L D, Ohsato A. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty[J]. International Journal of Project Management, 2008,26(6):688-698. [23] 刘士新, 宋健海, 唐加福. 基于关键链的资源受限项目调度新方法[J]. 自动化学报, 2006(1):60-66.Liu Shixin, Song Jianhai, Tang Jiafu. Critical chain based approach for resource-constrained project scheduling[J].Acta Automatica Sinica, 2006(1):60-66. [24] 张琦, 廖良才, 王卫威. 基于改进遗传算法的关键链合同项目进度计划优化[J]. 计算机技术与发展, 2014,24(4):1-5.Zhang Qi, Liao Liangcai, Wang Weiwei. Critical chain project schedule optimization based on improved genetic algorithm[J]. Computer Technology and Development, 2014,24(4):1-5. [25] Wang Weixin, Wang Xu, Ge Xianlong, et al. Multi-objective optimization model for multi-project scheduling on critical chain[J]. Advances in Engineering Software, 2014,68:33-39. [26] Yang Shanlin, Fu Lei. Critical chain and evidence reasoning applied to multi-project resource schedule in automobile R&D process[J]. International Journal of Project Management, 2014,32(1):166-177. [27] Feng Jingchun, Li Lei, Yang Nan, et al. Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North water diversion project[J]. Water Science and Engineering, 2011,4(2):225-236. [28] 万伟, 蔡晨, 王长峰. 在单资源约束项目中的关键链管理[J]. 中国管理科学, 2003,11(2):70-75.Wan Wei, Cai Chen, Wang Changfeng. Critical chain PM in single-resource constrained environment[J].Chinese Journal of Management Science, 2003,11(2):70-75. [29] 张沙清, 陈新度, 陈庆新, 等. 基于优化资源流约束的模具多项目反应调度算法[J]. 系统工程理论与实践, 2011,31(8):1571-1580.Zhang Shaqing, Chen Xindu, Chen Qingxin, et al. Reactive scheduling algorithm for multiple mould and die projects based on optimized resource flow constraints[J]. System Engineering Theory and Practice, 2011,31(8):1571-1580. [30] 仲刚, 乞建勋, 苏志雄. 基于模糊工期的关键链缓冲区设置方法研究[J]. 技术经济, 2009,28(7):48-50.Zhong Gang, Qi Jianxun, Su Zhixiong. Study on method for buffer placing in critical chain management with fuzzy duration[J]. Technology Economics, 2009,28(7):48-50. [31] 郑立平, 郝忠孝. 遗传算法理论综述[J]. 计算机工程与应用, 2003(21):50-53.Zheng Liping, Hao Zhongxiao. A review on the theory for the genetic algorithm[J]. Computer Engineering and Applications, 2003(21):50-53. [32] 廖良才, 张琦. 基于混合遗传算法和关键链的多资源多项目进度计划优化[J]. 科学技术与工程, 2014,14(6):190-195.Liao Liangcai, Zhang Qi. Multi-resource and multi-project schedule optimization based ona hybrid genetic algorithm and critical chain method[J]. Science Technology and Engineering, 2014,14(6):190-195. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
|