[1] 张立辉,邹鑫,黄元生,等.重复性项目调度模型的时差分析[J]. 中国管理科学, 2018, 26(6): 95-103.Zhang Lihui, Zou Xin, Huang Yuansheng, et al. Float analysis in repetitive scheduling model[J]. Chinese Journal of Management Science, 2018, 26(6): 95-103. [2] García-Nieves J D, Ponz-Tienda J L, Salcedo-Bernal A. The multimode resource-constrained project scheduling problem for repetitive activities in construction projects[J]. Computer-Aided Civil and Infrastructure Engineering, 2018, 33(8): 655-671. [3] Fan Suling, Sun Kuoshun, Wang Yuren. GA optimization model for repetitive projects with soft logic[J]. Automation in Construction, 2012, 21: 253-261. [4] Hyari K H, El-Rayes K, El-Mashaleh M. Automated trade-off between time and cost in planning repetitive construction projects[J]. Construction Management and Economics, 2009, 27(8): 749-761. [5] Long L D,Ohsato A. A genetic algorithm-based method for scheduling repetitive construction projects[J]. Automation in Construction, 2009, 18(4): 499-511. [6] Heravi G, Moridi S. Resource-constrained time-cost tradeoff for repetitive construction projects[J]. KSCE Journal of Civil Engineering, 2019, 23(8): 3265-3274. [7] García-Nieves J D, Ponz-Tienda J L, Ospina-Alvarado A, et al. Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects[J]. Automation in Construction, 2019, 105: 102799. [8] Hegazy T, Elhakeem A, Elbeltagi E. Distributed scheduling model for infrastructure networks[J]. Journal of Construction Engineering and Management, 2004, 130(2): 160-167. [9] 王伟鑫, 葛显龙, 王旭,等. 基于软逻辑关系的重复性项目调度工期:费用优化研究[J]. 管理工程学报, 2017, 31(1):201-207.Wang Weixin, Ge Xianlong, Wang Xu, et al. Time-cost tradeoff of repetitive project scheduling with soft logic[J]. Journal of Industrial Engineering/Engineering Management, 2017, 31(1):201-207. [10] Huang Yuansheng, Zou Xin, Zhang Lihui. Genetic algorithm-based method for the deadline problem in repetitive construction projects considering soft logic[J]. Journal of Management in Engineering, 2016, 32(4): 04016002. [11] Zou Xin, Fang S C, Huang Yuansheng, et al. Mixed-Integer linear programming approach for scheduling repetitive projects with time-cost trade-off consideration[J]. Journal of Computing in Civil Engineering, 2017, 31(3): 06016003. [12] Ammar M A. LOB and CPM integrated method for scheduling repetitive projects[J]. Journal of Construction Engineering and Management, 2013, 139(1): 44-50. [13] Arditi D, Tokdemir O B, Suh K. Scheduling system for repetitive unit construction using line-of-balance technology[J]. Engineering, Construction and Architectural Management, 2001, 8(2): 90-103. [14] Tokdemir O B, Arditi D, Balcik C. ALISS: Advanced linear scheduling system[J]. Construction Management and Economics, 2006, 24(12): 1253-1267. [15] Dolabi H R Z, Afshar A, Abbasnia R. CPM/LOB scheduling method for project deadline constraint satisfaction[J]. Automation in Construction, 2014, 48: 107-118. [16] Zou Xin, Zhang Qian, Zhang Lihui. Modeling and solving the deadline satisfaction problem in line-of-balance scheduling[J]. Journal of Management in Engineering, 2018, 34(1): 04017044. [17] Tang Yuanjie, Liu Rengkui, Wang Futian, et al.Scheduling optimization of linear schedule with constraint programming[J]. Computer-Aided Civil and Infrastructure Engineering, 2018, 33(2): 124-151. [18] Rossi F, Van Beek P, Walsh T. Handbook of constraint programming[M]. Elsevier, 2006. [19] Gedik R, Kirac E, Milburn A B, et al. A constraint programming approach for the team orienteering problem with time windows[J]. Computers & Industrial Engineering, 2017, 107:178-195. [20] 秦天保,葛浩,沙梅.约束规划求解集装箱装卸系统集成调度问题[J]. 系统工程理论与实践, 2015, 35(8): 2127-2136.Qin Tianbao, Ge Hao, Sha Mei. Constraint programming for the integrated scheduling problem of container handling systems in container terminals[J]. System Engineering-Theory & Practice, 2015, 35(8): 2127-2136. [21] Menesi W, Hegazy T. Multimode resource-constrained scheduling and leveling for practical-size projects[J]. Journal of Management in Engineering, 2014, 31(6): 04014092. [22] Rieck J, Zimmermann J, Gather T. Mixed-integer linear programming for resource leveling problems[J]. European Journal of Operational Research, 2012, 221(1): 27-37.
|