[1] Li C, Hall N G. Work package sizing and project performance[J]. Operations Research, 2019, 67(1): 123-142. [2] 苏志雄, 魏汉英, 涂远芬. 资源受限下平行工序顺序对优化的0-1规划模型[J]. 中国管理科学, 2019, 27(8): 208-216.Sun Zhixiong, Wei Hanying, Tu Yuanfen. 0-1 formulation model for optimization of pairing parallel activities under resource-constrained[J]. Chinese Journal of Management Science,2019, 27(8): 208-216. [3] Liu Wanlin, Zhang Jingwen, Liu Wanjun. Heuristic methods for finance-based and resource-constrained project scheduling problem[J]. Journal of Construction Engineering and Management, 2021, 147(11): 4021141. [4] 丁雪枫, 尤建新. 多模式资源受限项目调度问题的混合优化算法研究[J]. 中国管理科学, 2012, 20(S1): 154-159.Ding Xuefeng, You Jianxin. Studies on a hybrid optimal algorithm for multi-mode resource-constrained project scheduling problem[J]. Chinese Journal of Management Science,2012, 20(S1): 154-159. [5] 谢芳, 徐哲, 于静. 柔性资源约束下的项目调度问题双目标优化[J]. 系统工程理论与实践, 2016, 36(3): 674-683.Xie Fang, Xu Zhe, Yu Jing. Bi-objective optimization for the project scheduling problem with variable resource availability[J]. System Engineering-Theory & Practice, 2016, 36(3): 674-683. [6] Talbot F B. Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case[J]. Management Science, 1982, 28(10): 1197-1210. [7] Sprecher A, Hartmann S, Drexl A. An exact algorithm for project scheduling with multiple modes[J]. Operations-Research-Spektrum, 1997, 19(3): 195-203. [8] Hartmann S, Drexl A. Project scheduling with multiple modes: A comparison of exact algorithms[J]. Networks: An International Journal, 1998, 32(4): 283-297. [9] Rezaeian J, Soleimani F, Mohaselafshary S, et al. Using a meta-heuristic algorithm for solving the multi-mode resource-constrained project scheduling problem[J]. International Journal of Operational Research, 2015, 24(1): 1-16. [10] Mendes J J M, Gon Alves J F, Resende M G C. A random key based genetic algorithm for the resource constrained project scheduling problem[J]. Computers & Operations Research, 2009, 36(1): 92-109. [11] De Reyck B, Herroelen W. The multi-mode resource-constrained project scheduling problem with generalized precedence relations[J]. European Journal of Operational Research, 1999, 119(2): 538-556. [12] Józefowska J, Mika M, Róycki R, et al. Simulated annealing for multi-mode resource-constrained project scheduling[J]. Annals of Operations Research, 2001, 102(1-4): 137-155. [13] Jarboui B, Damak N, Siarry P, et al. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems[J]. Applied Mathematics and Computation, 2008, 195(1): 299-308. [14] 崔南方, 梁洋洋. 基于资源流网络与时间缓冲集成优化的鲁棒性项目调度[J]. 系统工程理论与实践, 2018, 38(1): 102-112.Cui Nanfang, Liang Yangyang. Robust project scheduling based on the integrated optimization between resource flow network and time buffers[J]. System Engineering-Theory & Practice, 2018, 38(1): 102-112. [15] 王艳婷, 何正文, 刘人境. 随机多模式项目前摄性调度与反应性调度的权衡[J]. 管理工程学报, 2018, 32(4): 158-166.Wang Yanting, He Zhengwen, Liu Renjing. Trade-off between stochastic multi-mode proactive scheduling and reactive scheduling[J]. Journal of Industrial Engineering/Engineering Management, 2018, 32(4): 158-166. [16] 王凌, 郑环宇, 郑晓龙. 不确定资源受限项目调度研究综述[J]. 控制与决策, 2014, 29(4): 577-584.Wang Ling, Zheng Huanyu, Zheng Xiaolong. Survey on resource-constrained project scheduling under uncertainty[J]. Control and Decision, 2014, 29(4): 577-584. [17] Radermacher F J. Cost-dependent essential systems of ES-strategies for stochastic scheduling problems[J]. Methods of Operations Research, 1981, 42: 17-31. [18] Radermacher F J. Scheduling of project networks[J]. Annals of Operations Research, 1985, 4(1): 227-252. [19] Ballestín F. When it is worthwhile to work with the stochastic RCPSP?[J]. Journal of Scheduling, 2007, 10(3): 153-166. [20] Ballestín F, Leus R. Resource-constrained project scheduling for timely project completion with stochastic activity durations[J]. Production & Operations Management, 2009, 18(4): 459-474. [21] Tsai Y W, Gemmill D D. Using tabu search to schedule activities of stochastic resource-constrained projects[J]. European Journal of Operational Research, 1998, 111(1): 129-141. [22] Chen Z, Demeulemeester E, Bai S, et al. Efficient priority rules for the stochastic resource-constrained project scheduling [J]. Journal of Operational Research, 2018, 270(3): 957-967. [23] Ashtiani B, Leus R, Aryanezhad M B. New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing[J]. Journal of Scheduling, 2011, 14(2): 157-171. [24] Rostami S, Creemers S, Leus R. New strategies for stochastic resource-constrained project scheduling[J]. Journal of Scheduling, 2018, 21(3): 349-365. [25] Brcˇic' M, Katic' M, Hlupic' N. Planning horizons based proactive rescheduling for stochastic resource-constrained project scheduling problems[J]. European Journal of Operational Research, 2019, 273(1): 58-66. [26] Creemers S. Minimizing the expected makespan of a project with stochastic activity durations under resource constraints[J]. Journal of Scheduling, 2015, 18(3): 263-273. [27] Creemers S. The preemptive stochastic resource-constrained project scheduling problem[J]. European Journal of Operational Research, 2019, 277(1): 238-247. [28] Li H, Womer N K. Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming[J]. European Journal of Operational Research, 2015, 246(1): 20-33. [29] Kolisch R, Sprecher A, Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems[J]. Management Science, 1995, 41(10): 1693-1703. [30] Bellman R. Dynamic programming[J]. Science, 1966, 153(3731): 34-37. [31] Goodson J C, Thomas B W, Ohlmann J W. A rollout algorithm framework for heuristic solutions to finite-horizon stochastic dynamic programs[J]. European Journal of Operational Research, 2017, 258(1): 216-229. [32] 李小鹏, 李存斌, 庞南生. 基于图的广度搜索的进度生成机制[J]. 中国管理科学, 2018, 26(9): 119-128.Li Xiaopeng, Li Cunbin, Pang Nansheng. A schedule generation scheme based on breadth search of graph[J]. Chinese Journal of Management Science, 2018, 26(9): 119-128. [33] Sprecher A. PSPLIB-A project scheduling problem library[J]. European Journal of Operational Research, 1997, 96(1): 205-216. [34] Deblaere F, Demeulemeester E, Herroelen W. Reactive scheduling in the multi-mode RCPSP[J]. Computers & Operations Research, 2011, 38(1): 63-74.
|