[1] Hartmann S, Briskorn D. A survey of variants and extensions of the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 2010, 207(1): 1-14. [2] Gonalves J F, Mendes J J, Resende M G. A genetic algorithm for the resource constrained multi-project scheduling problem[J]. European Journal of Operational Research, 2008, 189(3): 1171-1190. [3] Confessore G, Giordani S, Rismondo S. A market-based multi-agent system model for decentralized multi-project scheduling[J]. Annals of Operations Research, 2007, 150(1): 115-135. [4] Homberger J. A multiagent system for the decentralized resource-constrained multiproject scheduling problem[J]. International Transactions in Operational Research, 2007, 14(6): 565-589. [5] 彭武良, 陈良威, 马雪丽. 分散式项目群调度的双目标优化方法研究[J].管理工程学报, 2021, DOI: 10.13587/j.cnki.jieem.2021.05.012.Peng Wuliang, Chen Liangwei, Ma Xueli. Research on the double-objective optimization for decentralized project group scheduling[J]. Journal of Industrial Engineering and Engineering Management, 2021, DOI: 10.13587/j.cnki.jieem.2021.05.012. [6] Chan H K, Chung S H. Optimisation approaches for distributed scheduling problems[J]. International Journal of Production Research, 2013, 51(9): 2571-2577. [7] Araúzo J A, Pajares J, Lopez-Paredes A. Simulating the dynamic scheduling of project portfolios[J]. Simulation Modelling Practice and Theory, 2010, 18(10): 1428-1441. [8] 应瑛, 寿涌毅. 基于组合拍卖方法的资源受限多项目调度[J]. 计算机集成制造系统, 2009, 15(11): 2160-2165.Ying Ying, Shou Yongyi. Resource-constrained multi-project scheduling based on combinatorial auction method[J]. Computer Integrated Manufacturing Systems, 2009, 15(11): 2160-2165. [9] 王磊, 战德臣, 聂兰顺. 基于市场机制的多项目分散式调度问题[J]. 计算机集成制造系统, 2014, 20(8): 1969-1979.Wang Lei, Zhan Dechen, Nie Lanshun. Multi-project decentralized scheduling problem solving by market mechanism[J]. Computer Integrated Manufacturing Systems, 2014, 20(8): 1969-1979. [10] Adhau S, Mittal M L, Mittal A. A multi-agent system for distributed multi-project scheduling: An auction-based negotiation approach[J]. Engineering Applications of Artificial Intelligence, 2012, 25(8): 1738-1751. [11] Song Wen, Kang Donghun, Zhang Jie, et al. A multi-unit combinatorial auction based approach for decentralized multi-project scheduling[J]. Autonomous Agents and Multi-Agent Systems, 2017, 31(6): 1548-1577. [12] Homberger J. A (μ, λ)-coordination mechanism for agent-based multi-project scheduling[J]. OR spectrum, 2012, 34(1): 107-132. [13] Homberger J, Fink A. Generic negotiation mechanisms with side payments - design, analysis and application for decentralized resource-constrained multi-project scheduling problems[J]. European Journal of Operational Research, 2017, 261(3): 1001-1012. [14] Wauters T, Verbeeck K, De Causmaecker P, et al. A learning-based optimization approach to multi-project scheduling[J]. Journal of Scheduling, 2015, 18(1): 61-74. [15] 李飞飞, 徐哲, 于静. 基于序贯博弈谈判机制的分布式多项目调度[J]. 系统工程理论与实践, 2018, 38(3): 696-709.Li Feifei, Xu Zhe, Yu Jing. A sequential game-based negotiation approach to distributed multi-project scheduling problem[J]. Systems Engineering-Theory & Practice, 2018, 38(3): 696-709. [16] 刘东宁, 徐哲, 李飞飞. 基于合作博弈协商机制的分布式资源受限多项目调度[J]. 系统工程理论与实践, 2019, 39(6): 1507-1516.Liu Dongning, Xu Zhe, Li Feifei. Distributed resource constrained multi-project scheduling problem with cooperative-game based negotiation mechanism[J]. Systems Engineering-Theory & Practice, 2019, 39(6): 1507-1516. [17] Tosselli L, Bogado V, Martínez E. A repeated-negotiation game approach to distributed (re)scheduling of multiple projects using decoupled learning[J]. Simulation Modelling Practice and Theory, 2020, 98: 101980. [18] 刘婉君, 张静文, 刘万琳. 基于拍卖机制的资源转移时间型动态分布式多项目调度[J].中国管理科学, 2021, DOI: 10.16381/j.cnki.issn1003-207x.2020.0687.Liu Wanjun, Zhang Jingwen, Liu Wanlin. Dynamic decentralized resource-constrained multi-project scheduling problem with transfer times based on auction mechanism[J]. Chinese Journal of Management Science, 2021, DOI: 10.16381/j.cnki.issn1003-207x.2020.0687. [19] Song Wen, Xi Hui, Kang Donghun, et al. An agent-based simulation system for multi-project scheduling under uncertainty[J]. Simulation Modelling Practice and Theory, 2018, 86: 187-203. [20] 胡雪君, 赵燕, 单汨源, 等. 基于自适应大邻域搜索的鲁棒多项目调度方法[J]. 中国管理科学, 2020, DOI: 10.16381/j.cnki.issn1003-207x.2020.1096.Hu Xuejun, Zhao Yan, Shan Miyuan, et al. An adaptive large neighborhood search metaheuristic for robust multi-project scheduling[J]. Chinese Journal of Management Science, 2020, DOI: 10.16381/j.cnki.issn1003-207x.2020.1096. [21] 刘东宁, 徐哲. 基于多优先规则启发式的分布式多项目随机调度[J].系统工程理论与实践, 2021, DOI: 10.12011/SETP2020-2982.Liu Dongning, Xu Zhe. A stochastic scheduling for distributed multi-project with multi-PR heuristic[J]. Systems Engineering-Theory & Practice, 2021, DOI: 10.12011/SETP2020-2982. [22] Zhao Song, Xu Zhe. New closed-loop approximate dynamic programming for solving stochastic decentralized multi-project scheduling problem with resource transfers[J]. Expert Systems with Applications, 2021, 185: 115593. [23] Liu Dongning, Xu Zhe, Li Feifei. A three-stage decomposition algorithm for decentralized multi-project scheduling under uncertainty[J]. Computers & Industrial Engineering, 2021, 160: 107553. [24] 刘万琳, 张静文, 刘婉君. 带有资源柔性约束的max-NPV分布式多项目调度问题[J]. 运筹与管理, 2021, 30(8): 37-43.Liu Wanlin, Zhang Jingwen, Liu Wanjun. Max-NPV of distributed multi-project scheduling problem with resource flexibility constraints[J]. Operations Research and Management Science, 2021, 30(8): 37-43. [25] 谢芳, 李洪波, 柏庆国. 随机多模式资源受限项目调度[J].中国管理科学, 2021, DOI:10.16381/j.cnki.issn1003-207x.2020.1250.Xie Fang, Li Hongbo, Bai Qingguo. Stochastic multi-mode resource-constrained project scheduling[J]. Chinese Journal of Management Science, 2021, DOI:10.16381/j.cnki.issn1003-207x.2020.1250. [26] Li H, Womer N K. Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming[J]. European Journal of Operational Research, 2015, 246(1): 20-33.
|