Chinese Journal of Management Science ›› 2023, Vol. 31 ›› Issue (4): 79-88.doi: 10.16381/j.cnki.issn1003-207x.2020.0718
• Articles • Previous Articles Next Articles
ZHANG Jun-guang, WAN Dan
Received:
2020-04-21
Revised:
2021-04-22
Online:
2023-04-20
Published:
2023-05-06
Contact:
张俊光
E-mail:zhangjg@ustb.edu.cn
CLC Number:
ZHANG Jun-guang, WAN Dan. Integrated Buffer Monitoring and Control Based on Activity Criticality[J]. Chinese Journal of Management Science, 2023, 31(4): 79-88.
[1] Herroelen W, Leus R, Demeulemeester E. Critical chain project scheduling-Do not oversimplify[J]. Project Management Journal, 2002, 33(4): 46-60. [2] 田旻, 张光军, 刘人境. 基于改进关键链方法的MRCPSP的鲁棒性优化[J]. 系统工程学报, 2019, 152(2): 135-146.Tian Min, Zhang Guangjun, Liu Renjing. Robust optimization of the MRCPSP based on improved critical chain method[J]. Journal of Systems Engineering, 2019, 152(2): 135-146. [3] 张俊光, 万丹. 基于多项目双重风险共担的鼓缓冲设置研究[J]. 运筹与管理, 2021, 30(2), 218-224.Zhang Junguang, Wan Dan. Research on drum buffer sizing based on double risk-pooling of multi-project system[J]. Operations Research and Management Science, 2021, 30(2), 218-224. [4] Zhang Junguang, Song Xiwei, Díaz E. Project buffer sizing of a critical chain based on comprehensive resource tightness[J]. European Journal of Operational Research, 2016, 248(1):174-182. [5] Zarghami A, Gunawan I, Zubielqui D, et al. Incorporation of resource reliability into critical chain project management buffer sizing[J]. International Journal of Production Research, 2020, 58(20): 6130-6144. [6] Long L D, Ohsato A. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty[J]. International Journal of Project Management, 2008, 26(6): 688-698. [7] Zhang Junguang, Song Xiwei, Chen Hongyu, et al. Determination of critical chain project buffer based on information flow interactions[J]. Journal of the Operational Research Society, 2016, 67(9):1146-1157. [8] Gutierrez G, Paul A. Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance[J]. Operations Research, 2000, 48(6): 927-938. [9] Goldratt E M. Critical chain[M]. Great Barrington, Mass, USA: The North River Press Publishing Corporation, 1997. [10] Leach L P. Critical chain project management, Third edition[M]. London: Artech House Incorporation, 2014. [11] Bie Li, Cui Nanfang, Zhang Xiaoming. Buffer sizing approach with dependence assumption between activities in critical chain scheduling[J]. International Journal of Production Research, 2012, 50(24): 7343-7356. [12] Bevilacqua M, Ciarapica F E, Giacchetta G. Critical chain and risk analysis applied to high-risk industry maintenance: a case study[J]. International Journal of Project Management, 2009, 27(4): 419-432. [13] Chen Zhi, Demeulemeester E, Bai Sijun, et al. A Bayesian approach to set the tolerance limits for a statistical project control method[J]. International Journal of Production Research, 2020, 58(10): 3150-3163. [14] 别黎, 崔南方. 关键链动态缓冲监控方法研究[J]. 中国管理科学, 2010, 18(6): 97-103.Bie Li, Cui Nanfang. Research on dynamic buffer monitoring in critical chain project management[J]. Chinese Journal of Management Science, 2010, 18(6): 97-103. [15] Zhang Junguang, Shi Ruixia, Diaz E. Dynamic monitoring and control of software project effort based on an effort buffer[J]. Journal of the Operational Research Society, 2015, 66(9): 1555-1565. [16] 张俊光, 万丹. 关键链项目实时滚动监控方法研究[J]. 中国管理科学, 2018, 26(4): 171-179.Zhang Junguang, Wan Dan. Dynamic real-time monitoring and control of a critical chain project[J]. Chinese Journal of Management Science, 2018, 26(4): 171-179. [17] Zhang Junguang, Jia Saike, Diaz E. Dynamic monitoring and control of a critical chain project based on phase buffer allocation[J]. Journal of the Operational Research Society, 2018, 69(12): 1966-1977. [18] 张静文, 刘耕涛. 基于鲁棒性目标的关键链项目调度优化[J]. 系统工程学报, 2015, 30(1): 135-144.Zhang Jingwen, Liu Gentao. Critical chain project scheduling problem with the robust objective[J]. Journal of Systems Engineering, 2015, 30(1): 135-144. [19] 胡雪君, 王建江, 崔南方. 基于统计过程控制的两阶段缓冲监控方法[J]. 控制与决策, 2020, 35(6): 1453-1462.Hu Xuejun, Wang Jianjiang, Cui Nanfang. Two-stage buffer monitoring method based on statistical process control[J]. Control and Decision, 2020, 35(6): 1453-1462. [20] Zhao Yan, Cui Nanfang, Tian Wendi. A two-stage approach for the critical chain project rescheduling[J]. Annals of Operations Research, 2020, 285(1): 67-95. [21] Zhang Junguang, Wan Dan. Integrated buffer monitoring and control based on grey neural network[J]. Journal of the Operational Research Society, 2019, 70(3): 516-529. [22] Vanhoucke M. On the dynamic use of project performance and schedule risk information during project tracking[J]. Omega, 2011, 39(4): 416-426. [23] 别黎, 崔南方, 田文迪,等. 基于活动敏感性的动态缓冲监控方法研究[J]. 中国管理科学, 2014, 22(10):113-121.Bie Li, Cui Nanfang, Tian Wendi, et al. Research on activity sensitivity index based dynamic buffer monitoring method[J]. Chinese Journal of Management Science, 2014, 22(10):113-121. [24] Hu Xuejun, Cui Nanfang, Demeulemeester E, et al. Incorporation of activity sensitivity measures into buffer management to manage project schedule risk[J]. European Journal of Operational Research, 2016, 249(2): 717-727. [25] Elmaghraby S E. On criticality and sensitivity in activity networks[J]. European Journal of Operational Research, 2000, 127(2): 220-238. [26] Ballesteros P, Cerezo A, Otero M, et al. Performance comparison of activity sensitivity metrics in schedule risk analysis[J]. Automation in Construction, 2019, DOI: 10.1016/S0926580519301682. [27] Song Jie, Martens A, Vanhoucke M. Using schedule risk analysis with resource constraints for project control[J]. European Journal of Operational Research, 2021, 288(3): 736-752. [28] Madadi M, Iranmanesh H. A management oriented approach to reduce a project duration and its risk (variability)[J]. European Journal of Operational Research, 2012, 219(3): 751-761. [29] 施骞, 王雅婷, 龚婷. 项目缓冲设置方法及其评价指标改进[J]. 系统工程理论与实践, 2012, 32(8): 1739-1746.Shi Qian, Wang Yating, Gong Ting. An improved approach for project buffer sizing and evaluation[J]. Systems Engineering-Theory & Practice. 2012, 32(8): 1739-1746. [30] 顾蛟. YS公司智慧党建软件开发项目进度管理研究[D]. 成都:电子科技大学,2020.Gu Jiao. Research on schedule management of intelligent party building software project of YS company[D]. Chengdu: University of Electronic Science and Technology of China, 2020. |
[1] | Chunqiao Tan,Huimin Zhao,Li Zhou. Research on Supplier Market Encroachment and Supplier's Traceability Investment Considering Information Sharing Strategy under Uncertain Demand [J]. Chinese Journal of Management Science, 2024, 32(10): 301-312. |
[2] | Haiping Wang,Jun Lin,Lun Ran. Pricing Strategy of a Software-as-a-Service Provider and the Social Welfare Analysis in a Competitive Market [J]. Chinese Journal of Management Science, 2024, 32(10): 89-96. |
[3] | Huafeng Du,Zhenzhong Guan,Jianbiao Ren. The Sales Model and Pricing Strategy of Software Enterprise [J]. Chinese Journal of Management Science, 2024, 32(10): 76-88. |
[4] | Shizhen Bai,Xuelian Jia. Research on Operational Strategy of Capital-constrained Dual-channel Supply Chain of Fresh Agricultural Products [J]. Chinese Journal of Management Science, 2024, 32(10): 275-285. |
[5] | Qiang Lin,Hengjia Guo,Wenzhuo Li,Xiaogang Lin. Coupon Delivery Strategies of E-commerce Platforms under BOPS Omni-channel [J]. Chinese Journal of Management Science, 2024, 32(9): 237-247. |
[6] | Zehui Ge,Yunhuan Zhang,Daoping Wang,Xinyu Li. Cooperation Mode of Online Marketing Service Supply Chain Considering Complementarity and Channel Power [J]. Chinese Journal of Management Science, 2024, 32(9): 271-280. |
[7] | Hongxu Yan,Shunkun Yu. Research on Employee Turnover Prediction Model Based on the Portrait [J]. Chinese Journal of Management Science, 2024, 32(9): 303-312. |
[8] | Yinyun Yu,Congdong Li,Yelin Fu,Kinkeung Lai. A Cross-efficiency Evaluation Method Considering Decision Maker Preference Structure [J]. Chinese Journal of Management Science, 2024, 32(8): 117-126. |
[9] | Zongyu Mu,Xiaoxia Yang,Ke Li,Guitao Zhang. Online Assisting Farmers Mode and Financing Strategy of Smart Platform Supply Chain [J]. Chinese Journal of Management Science, 2024, 32(8): 170-181. |
[10] | Zongming Zhang,Jian Chai,Xiuwu Liao. Research on Timing of IT Outsourcing Considering Contract Types and Demand Uncertainty [J]. Chinese Journal of Management Science, 2024, 32(8): 182-193. |
[11] | Biao Li,Xiqiang Xia,Qiuyue Li. Research on the Influence of Carbon Trading on Carbon Emission Reduction Effect and Coordination Mechanism under Carbon Quotas [J]. Chinese Journal of Management Science, 2024, 32(8): 250-260. |
[12] | Yi Tao,Ruisi Yang,Qiang Lin,Fan Wang. Financing and Pricing Decision Models of an E-commerce Supply Chain Considering Competition and Risk Aversion [J]. Chinese Journal of Management Science, 2024, 32(7): 190-200. |
[13] | Yue Zhao,Yanzhi Wang,Jie Song,Xuan He. Research on Data Value Based on Demand Forecast of Online Medical Platform [J]. Chinese Journal of Management Science, 2024, 32(7): 28-36. |
[14] | Lin Pan,Xiajing Xu,Rongting Zhou. Research on Dual Channel Dynamic Pricing of Community Fresh Food Supply Chain from the Perspective of Competition [J]. Chinese Journal of Management Science, 2024, 32(7): 300-310. |
[15] | Junxiu Jia,Yishu Hou,Li Du. Service Quality and Pricing Decision of Health Operation with Referral Rate [J]. Chinese Journal of Management Science, 2024, 32(6): 109-119. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
|