方晨, 王凌. 资源约束项目调度研究综述[J]. 控制与决策, 2010, 25(5): 641-650+656.
|
|
Fang Chen, Wang Ling. Survey on resource-constrained project scheduling[J]. Control and Decision, 2010, 25(5): 641-650+656.
|
2 |
Blazewicz J, Lenstra J K, Rinooy Kan A H G. Scheduling subject to resource constraints: classification and complexity[J]. Discrete Applied Mathematics, 1983, 5(1): 11-24.
|
3 |
Chen Rong, Liang Changyong, Gu Dongxiao, et al. A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution[J]. International Journal of Production Research, 2017, 55 (21): 6207-6234.
|
4 |
Snauwaert J, Vanhoucke M. A new algorithm for resource-constrained project scheduling with breadth and depth of skills[J]. European Journal of Operational Research, 2021, 292(1): 43-59.
|
5 |
石彪, 池宏, 祁明亮, 等. 资源约束下的应急预案重构方法研究[J]. 中国管理科学, 2017, 25(1): 117-128.
|
|
Shi Biao, Chi Hong, Qi Mingliang, et al. A study on emergency plan reconstruction with resource constraint[J]. Chinese Journal of Management Science, 2017, 25(1): 117-128.
|
6 |
田文迪, 胡慕海, 崔南方. 不确定性环境下鲁棒性项目调度研究综述[J]. 系统工程学报, 2014, 29(1): 136-144.
|
|
Tian Wendi, Hu Muhai, Cui Nanfang. Review of studies on robust project scheduling under uncertainty[J]. Journal of Systems Engineering, 2014, 29(1): 136-144.
|
7 |
何正文, 宁敏静, 徐渝. 前摄性及反应性项目调度方法研究综述[J]. 运筹与管理, 2016, 25(5): 278-287.
|
|
He Zhengwen, Ning Minjing, Xu Yu. A survey of proactive and reactive project scheduling methods[J]. Operations Research and Management Science, 2016, 25(5): 278-287.
|
8 |
Bianco L, Caramia M. A new formulation for the project scheduling problem under limited resources[J]. Flexible Services and Manufacturing Journal, 2013, 25(1-2): 6-24.
|
9 |
Artigues C. On the strength of time-indexed formulations for the resource-constrained project scheduling problem[J]. Operations Research Letters, 2017, 45(2): 154-159.
|
10 |
Nemati-Lafmejani R, Davari-Ardakani H, Najafzad H. Multi-mode resource constrained project scheduling and contractor selection: mathematical formulation and metaheuristic algorithms[J]. Applied Soft Computing, 2019, 81: 105533.
|
11 |
Koné O, Artigues C, Lopez P, et al. Event-based MILP models for resource-constrained project scheduling problems[J]. Computers & Operations Research, 2011, 38(1): 3-13.
|
12 |
Tesch A. A polyhedral study of event-based models for the resource-constrained project scheduling problem[J]. Journal of Scheduling, 2020, 23: 233-251.
|
13 |
初梓豪, 徐哲. 活动重叠对缩短资源受限项目工期有效性研究[J]. 系统工程理论与实践, 2019, 39(9): 2388-2397.
|
|
Chu Zihao, Xu Zhe. Research on the effectiveness of activities overlapping in reducing project duration under resource constrained condition[J]. Systems Engineering-Theory & Practice, 2019, 39(9): 2388-2397.
|
14 |
于静, 徐哲, 谢芳. 活动重叠模式与资源约束下的项目调度优化[J]. 管理科学学报, 2017, 20(9): 36-45.
|
|
Yu Jing, Xu Zhe, Xie Fang. Project scheduling optimization with overlapping modes and resource constraints[J]. Journal of Management Sciences in China, 2017, 20(9): 36-45.
|
15 |
谢芳, 徐哲, 于静. 柔性资源约束下的项目调度问题双目标优化[J]. 系统工程理论与实践, 2016, 36(3): 674-683.
|
|
Xie Fang, Xu Zhe, Yu Jing. Bi-objective optimization for the project scheduling problem with variable resource availability [J]. Systems Engineering-Theory & Practice, 2016, 36(3): 674-683.
|
16 |
Naber A, Kolisch R. MIP models for resource- constrained project scheduling with flexible resource profiles [J]. European Journal of Operational Research, 2015, 239(2): 335-348.
|
17 |
张松, 陈华平, 刘建. 复杂时间约束的水利工程项目调度问题研究[J]. 系统工程学报, 2016, 31(1): 135-144.
|
|
Zhang Song, Chen Huaping, Liu Jian. Research on the complicated time-constrained project scheduling in water conservancy[J]. Journal of Systems Engineering, 2016, 31(1): 135-144.
|
18 |
Kong Feng, Dou Dong. Resource-constrained project scheduling problem under multiple time constraints[J]. Journal of Construction Engineering and Management, 2021, 147(2): 04020170.
|
19 |
谢芳, 李洪波, 柏庆国. 随机多模式资源受限项目调度[J]. 中国管理科学, 2020, 网络首发: 1-13.
|
|
Xie Fang, Li Hongbo, Bai Qingguo. Stochastic multi-mode resource-constrained project scheduling[J]. Chinese Journal of Management Science, 2020, omline: 1-13.
|
20 |
Ma Zhiliang, Li Songyang, Wang Yong, et al. Component-level construction schedule optimization for hybrid concrete structures[J]. Automation in Construction, 2021, 125 (10): 103607.
|
21 |
Kannan R, Barton P I. Convergence-order analysis of branch-and-bound algorithms for constrained problems[J]. Journal of Global Optimization, 2018, 71: 753-813.
|
22 |
Davari M, Demeulemeester E. A novel branch-and- bound algorithm for the chance-constrained resource- constrained project scheduling problem[J]. International Journal of Production Research, 2018, 57(4): 1265-1282.
|
23 |
Liu Changchun, Xiang Xi, Zheng Li, et al. An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing[J]. International Journal of Production Research, 2018, 56(19): 6491-6511.
|
24 |
Wang Qiang, Liu Changchun, Zheng Li. A column- generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource[J]. Engineering Optimization, 2020, 52(5): 798-816.
|
25 |
Coelho J, Vanhoucke M. An exact composite lower bound strategy for the resource-constrained project scheduling problem[J]. Computers & Operations Research, 2018, 93(1): 135-150.
|
26 |
Ismael de Azevedo G H, Pessoa A A, Subramanian A. A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints[J]. European Journal of Operational Research, 2021, 289(3): 809-824.
|
27 |
Guo Weikang, Vanhoucke M, Coelho J, et al. Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem[J]. Expert Systems with Applications, 2020, 167: 114116.
|
28 |
安晓亭, 张梓琪. 基于改进蚁群优化的多目标资源受限项目调度方法[J]. 系统工程理论与实践, 2019, 39(2): 509-519.
|
|
An Xiaoting, Zhang Ziqi. Multi-objective resource constrained project scheduling problem based on improved ant colony optimization[J]. Systems Engineering——Theory & Practice, 2019, 39(2): 509-519.
|
29 |
Servranckx T, Vanhoucke M. A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs[J]. European Journal of Operational Research, 2019, 273(3): 841-860.
|
30 |
Zaman F, Elsayed S, Sarker R, et al. An evolutionary approach for resource constrained project scheduling with uncertain changes[J]. Computers & Operations Research, 2020, 125: 105104.
|
31 |
Chaleshtarti A S, Shadrokh S, Khakifirooz M, et al. A hybrid genetic and Lagrangian relaxation algorithm for resource-constrained project scheduling under nonrenewable resources[J]. Applied Soft Computing, 2020, 94: 106482.
|
32 |
Ren Yifei, Lu Zhiqiang, Liu Xinyi. A branch-and-bound embedded genetic algorithm for resource-constrained project scheduling problem with resource transfer time of aircraft moving assembly line[J]. Optimization Letters, 2020, 14(6): 2161-2195.
|