主管:中国科学院
主办:中国优选法统筹法与经济数学研究会
   中国科学院科技战略咨询研究院
Articles

The Impact of Control on Performance of Enterprise Information Technology Project in the Risk Environment: The View from Project Managers and User Liaisons

Expand
  • 1. School of Economics & Management, Nanchang University, Nanchang 330000, China;
    2. Economics and Management School, Wuhan University, Wuhan 430072, China;
    3. School of Management, Huazhong University of Science and Technology, Wuhan 430074, China

Received date: 2013-06-28

  Revised date: 2014-03-13

  Online published: 2015-10-24

Abstract

Although project management ability is improved continuously, the success rate of enterprise information systems project is still pessimistic. Lack of roles orientation and mutual understanding, and lack of effective risk control mechanisms are the key factors that negatively influence project performance. In order to explore the joint effect of risk and control on information systems project performance from different perspectives, 65 project managers and 63 user liaisons from 128 projects are investigated. Furthermore, empirical analysis is conducted by using structural equation model. Hypotheses are tested by employing hierarchical regression analysis. The results show that both formal and informal controls positively affected project performance. However, formal control is more effective for project managers, while informal control is more effective for user liaisons. In addition, organization risk and technology risk suppress the effect of formal and informal controls on performance from the perspectives of both project managers and user liaisons. Therefore, the choice of control should not only be based on the characteristics of projects, but also on the role of stakeholders. Moreover, the project performance not only depends on success or failure factors, also on their balance. The research results provide a new conceptual framework and decision-making support for controlling risks in information systems projects.

Cite this article

LIU Min, LIU Shan, ZHANG Jin-long . The Impact of Control on Performance of Enterprise Information Technology Project in the Risk Environment: The View from Project Managers and User Liaisons[J]. Chinese Journal of Management Science, 2015 , 23(10) : 78 -87 . DOI: 10.16381/j.cnki.issn1003-207x.2015.10.009

References

[1] Curtis J. The importance of a great project manager[EB/OL].[2012-6-25] [2012-12-30] http://quotient.net/blog/2012/6/25/the-importance-of-a-great-project-manager/.

[2] CSDN.2013年ERP研究:CFO需重视失败率[EB/OL].[2013-03-04].http://www.csdn.net/article/a/2013-03-04/15814265.

[3] 白海青, 毛基业. 影响ERP成功应用的关键因素因果模型——上线后的视角[J]. 管理世界, 2011,(3):102-111.

[4] 朱宗乾, 师红昆, 张永辉. 基于影响图理ERP项目实施风险评价模型研究[J]. 管理评论, 2010, 22(12):45-52.

[5] Kirsch L. Portfolios of control modes and IS project management[J]. Information Systems Research, 1997, 8(3):215-239.

[6] Kirsch L, Sambamurthy V, Ko D, et al. Controlling information systems development projects:The view from the client[J]. Management Science, 2002, 48(4):484-498.

[7] Kirsch L J, Ko D, Haney M H. Investigating the antecedents of team-based clan control:Adding social capital as a predictor[J]. Organization Science, 2010, 21(2), 469-489.

[8] Kirsch L. Deployingcommon systems globally:The dynamics of control[J]. Information Systems Research, 2004, 15(4):374-395.

[9] 李晓燕, 毛基业. 动态能力构建——基于离岸软件外包供应商的多案例研究[J]. 管理科学学报, 2010, 13(11):55-64.

[10] Klein G, Beranek P, Martz B, et al. The relationship of control and learning to project performance[J]. Cybernetics and Systems:An International Journal, 2006, 37(2-3):137-150.

[11] Rustagi S, King W R, Kirsch L J. Predictors of formal control usage in IT outsourcing partnerships[J]. Information Systems Research, 2008, 19(2):126-143.

[12] Harris M L, Collins R W, Hevner A R. Control of flexible software development under uncertainty[J]. Information Systems Research, 2009, 20(3):400-419.

[13] Gopal A, Gosain S. The role of organizational controls and boundary spanning in software development outsourcing:Implications for project performance[J]. Information Systems Research, 2010, 21(4), 960-982.

[14] Markus M L, Mao Jiye. Participation in development and implementation-updating an old, tired concept for today's IS contexts[J]. Journal of the Association for Information Systems, 2004, 5(11-12):514-544.

[15] 潘绵臻, 毛基业. 反思性学习会议对ERP实施中用户参与的影响——基于心理授权的视角[J]. 管理科学学报, 2013, 16(12):21-36.

[16] Tiwana A, Keil M, Control in internal and outsourced systems development projects[J]. Journal of Management Information Systems, 2010, 26(3), 9-44.

[17] 刘汕, 张金隆, 陈涛. 企业IT项目控制模式对绩效的影响研究[J]. 科研管理, 2012, 33(7):112-120.

[18] 曹萍, 陈福集. 基于证据推理的软件项目投标风险评估[J]. 科研管理, 2012, 33(7):106-111.

[19] 谷晓燕, 何锋, 蔡晨. 风险条件下基于实物期权的研发项目多阶段评价模型[J]. 中国管理科学, 2011, 19(4):68-75.

[20] 朱宗乾, 李艳霞, 张美. 基于风险控制的ERP项目风险分担模型研究[J]. 科研管理, 2011, 32(11):91-99.

[21] 李轲, 宋华明, 许前, 等. 考虑风险偏好的外包质量风险控制与激励机制研究[J]. 中国管理科学, 2013, 21(S1):190-197.

[22] Keil M, Rai A, Liu Shan. How user risk and requirements risk moderate the effects of formal and informal control on the process performance of IT projects[J]. European Journal of Information Systems, 2013, 22(6):650-672.

[23] Tiwana A. Does technological modularity substitute for control? A study of alliance performance in software outsourcing[J]. Strategic Management Journal, 2008, 29(7):769-780.

[24] Tiwana A. Systems development ambidexterity:Explaining the complementary and substitutive roles of formal and informal controls[J]. Journal of Management Information Systems, 2010, 27(2):87-126.

[25] Liu Shan. How team risk and planning and control risk moderate the effects of clan and self control on the process performance of IT projects:The perspective of the user liaison[J]. Information Development, 2015,31(1):27-39.

[26] Liu Shan, Wang Lin. Understanding the impact of risks on performance in internal and outsourced information technology projects:The role of strategic importance[J]. International Journal of Project Management, 2014, 32(8):1494-1510.

[27] Wallace L, Keil M, Rai A. How software project risk affects project performance:An investigation of the dimensions of risk and an exploratory model[J]. Decision Sciences, 2004, 35(2):289-321.

[28] Liu Shan, Zhang Jinlong, Keil M, et al. Comparing senior executive and project manager perceptions of IT project risk:A Chinese Delphi study[J]. Information Systems Journal, 2010, 20(4), 319-355.

[29] Love P, Josephson P. Role of error-recovery process in projects[J]. Journal of Management in Engineering, 2004, 20(2):70-79.

[30] Lee Y, Cavusgil T S. Enhancing alliance performance:The effects of contractual-based versus relational-based governance[J]. Journal of Business Research, 2006, 59(8):896-905.

[31] Ouchi W A. Conceptual framework for the design of organizational control mechanisms[J]. Management Science, 1979, 25(9):833-848.

[32] Sengün A, Wasti S. Trust, control, and risk:A test of Das and Teng's conceptual framework for pharmaceutical buyer-supplier relationships[J]. Group & Organization Management, 2007, 32(4):430-464.

[33] Rustagi S. Antecedents of success in IS outsourcing:A control theory perspective[D]. Pittsturyh:University of Pittsburgh, 2004.

[34] 刘家国, 施高伟, 赵金楼. 企业ERP关键实施活动的强化机制[J]. 管理评论, 2013, 25(5):72-81.

[35] 叶强, 方安儒, 鲁奇, 等. 组织因素对ERP使用绩效的影响机制——基于中国数据的实证研究[J]. 管理科学学报, 2010, 13(11):77-85.

[36] 王长峰. 研发项目过程风险管理方法综合集成问题研究[J]. 中国管理科学, 2009, 17(4):148-155.

[37] Wallace L, Keil M, Rai A. Understanding software project risk:A cluster analysis[J]. Information & Management, 2004, 42(1):115-125.

[38] Petter S, Straub D, Rai A. Specifying formative constructs in information systems research[J]. MIS Quarterly, 2007, 31(4):623-656.

[39] Chin W W, Marcolin B L, Newsted P R. A partial least squares latent variable modeling approach for measuring interaction effects:Results from a monte carlo simulation study and an electronic-mail emotion adoption study[J]. Information Systems Research, 2003, 14(2):189-220.

[40] Gefen D, Straub D. A practical guide to factorial validity using pls-graph:Tutorial and annotated example[J]. Communications of the Association for Information Systems, 2005, 16(9):91-109.

[41] Fornell C, Larcker D F. Evaluating structural equation models with unobservable variables and measurement error[J]. Journal of Marketing Research. 1981, 18(1):39-50.

[42] Cohen J, Cohen P, West S G, et al. Applied multiple regression/correlation analysis for the behavioral sciences[M]. Mahwah, NJ:Lawrence Erlbaum Associates, 2003.
Outlines

/