主管:中国科学院
主办:中国优选法统筹法与经济数学研究会
   中国科学院科技战略咨询研究院
Articles

A Two-stage Operation Model for Emergency Management Based on Information Dynamic Updating In Earthquake Rescue

Expand
  • 1. School of Engineering Science, University of Chinese Academy of Science, Beijing 100049, China;
    2. School of Mathematical Sciences, Capital Normal University, Beijing 100048, China

Received date: 2015-07-30

  Revised date: 2016-03-01

  Online published: 2016-09-30

Abstract

Emergency supplies allocation is an important problem in emergency management. However, uncertain information of the disaster makes it hard to allot materials accurately and efficiently.In this paper, by focusing on the description and update of uncertain information, emergency supplies allocation strategy when earthquake occurs is studied. To describe the disaster, five factors are selected and different situations are constructed based on historical data. The information update process is described as the acknowledgement of the probability of each factor. Based on the updating of disaster information, the rescue process is divided into 2 stages: black stage and grey stage. In black stage, deciders only know magnitude and epicenter of this earthquake, therefore a robust model based on different situations is built. This model generates a robust result that considers the worst situation. Also, in this stage, historical information is used to generate situations to support robust model. In grey stage, damage index of each area updates successively, so that seismic intensity circle can be updated accordingly, and because of which, demand for each kind of material of each area can be updated. Then unsatisfying rate is computed, and a programming model is proposed for following supply allocation. Finally, by comparing our model against a model without information updating, experiment results show that our model has its advantages.

Cite this article

LIU Shu-yue, ZHU Jian-ming, HUANG Jun, SUN Jun-hong . A Two-stage Operation Model for Emergency Management Based on Information Dynamic Updating In Earthquake Rescue[J]. Chinese Journal of Management Science, 2016 , 24(9) : 124 -132 . DOI: 10.16381/j.cnki.issn1003-207x.2016.09.015

References

[1] 唐凤,朱建明,王晶,等.非常规突发事件应急物资需求分析研究[C]. 第四届国际应急管理论坛暨中国(双法)应急管理专业委员会第五届年会,北京, 12月12日-23日,2009.

[2] 中华人民共和国国家发展改革委员会.应急保障重点物资分类目录[S/OL].[2015-04-07].www.sdpc.gov.cn/zcfb/201504/t20150410-677159.html.

[3] 王晶,黄均,张玲.基于双层规划的应急资源布局模型和算法[C]. 中国控制与决策会议,桂林,6月17日-19日,2009.

[4] Liu Nan, Ye Yong. Humanitarian logistics planning for natural disaster response with bayesian information update[J]. Journal of industrial and management optimization, 2014,10(3):665-689.

[5] 庞海云,刘南. 基于不完全扑灭的应急物资分配博弈模型[J]. 浙江大学学报(工学版),2012, 46(11): 2068-2108.

[6] 詹沙磊,刘南. 基于灾情信息更新的应急物资配送多目标随机规划模型[J]. 系统工程理论与实践,2013, 33(1):159-166.

[7] Galindo G, Batta R. Review of recent developments in OR/MS research in disaster operations management[J]. European Journal of Operational Research,2013,230 (2) 201-211.

[8] 刘明,赵林度. 应急物资混合协同配送模式研究.控制与决策, 2011, 26 (1):96-100.

[9] 张玲, 陈涛,黄钧. 基于最大最小后悔值的应急救灾网络构建鲁棒优化模型与算法[J]. 中国管理科学. 2014,22(7):131-139.

[10] Guo Pengfei, Liu Fang. Optimal deployment of emergency supply inventory for the recurring disaster with a humanitarian relief objective[R]. Working Paper,SSRN, 2014.

[11] 葛洪磊. 基于灾情信息特征的应急物资分配决策模型研究[D]. 杭州:浙江大学, 2012.

[12] 高建国. 中国地震紧急救援理论研究 [J]. 华南地震, 2006, 26(1):118-125.

[13] 许卫晓,孙景江,林淋,等. 烈度快速评估中的实时修正方法研究[J]. 地震工程与工程震动, 2012,32(4):34-39.

[14] 范一大,杨思全,王磊,等. 汶川地震应急监测评估方法研究[J]. 遥感学报, 2008,12(6):858-864.

[15] 赵红蕊,王涛,石丽梅,等.芦山7.0级地震震后道路损毁风险评估方法研究[J]. 灾害学, 2014,29(2):33-37.

[16] 陈世荣,马海建,范一大,等. 基于高分辨率遥感影像的汶川地震道路损毁评估[J]. 遥感学报, 2008,12(6):949-955.

[17] 聂高众, 高建国,苏桂武,等. 地震应急救助需求的模型化处理[J]. 资源科学, 2001,23(1):69-76.

[18] 中国地震局地壳形变台网中心.中国地震烈度表[S/OL].[1999-04-26].www,dccdnc.ac.cn/html/zcfg/gfxwjz.jsp.
Outlines

/