主管:中国科学院
主办:中国优选法统筹法与经济数学研究会
   中国科学院科技战略咨询研究院
Articles

Production-Marketing Coordination under Demand and Leadtime Uncertainty

Expand
  • 1. School of Economics & Management, Jiangsu University of Science and Technology, Zhenjiang 212003, China;
    2. School of Economics & Management, Southeast University, Nanjing 211189, China;
    3. School of Economics & Management, Shandong Agricultural University, Taian 271018, China

Received date: 2015-01-01

  Revised date: 2015-06-20

  Online published: 2016-12-27

Abstract

A make-to-oder firm which satisfies the demand that is dependent on both price and quoted leadtime is considered in this paper. The firm operates in the decentralized framework in which pricing decision is delegated to the marketing department and replenishment and leadtime quotation decisions are delegated to the production department. The interactions between marketing and production are modelled as a Nash game and the existence and uniqueness of the equilibrium decisions are demonstrated. A mechanism that enables the firm to coordinate the decisions of the two departments is developed. Moreover, extensive numerical studies are conducted to illustrate how the optimal/equilibrium decisions vary with different parameters and the situations under which the firm does not need to apply the complicated coordination mechanism are identified.

Cite this article

YE Tao-feng, DA Qing-li, XU Xuan-guo . Production-Marketing Coordination under Demand and Leadtime Uncertainty[J]. Chinese Journal of Management Science, 2016 , 24(10) : 133 -140 . DOI: 10.16381/j.cnki.issn1003-207x.2016.10.015

References

[1] Palaka K,Erlebacher S,Kropp D.Lead-time setting,capacity utilization,and pricing decisions under lead-time dependent demand[J].ⅡE Transactions,1998,30(2):151-163.

[2] So KC,Song Jingsheng.Price,delivery time guarantees and capacity selection[J].European Journal of Operational Research,1998,111(1):28-49.

[3] So KC.Price and time competition for service delivery[J].Manufacturing&Service Operations Management,2000,2(4):392-409.

[4] 李义斌,陈荣秋.BTO环境下的定价与提前期给定协调决策研究[J].工业工程与管理,2010,15(5):22-28.

[5] 吴江华,翟昕,何玉红.供应链中基于信息更新的订货时间及价格联合决策研究[J].中国管理科学,2010,18(5):58-65.

[6] Ata B,Olsen TL.Congestion-based lead-time quotation and pricing for revenue maximization with heterogeneous customers[J].Queueing Systems,2013,73(1):35-78.

[7] Wu Zhengping,Kazaz B,Webster S,et al.Ordering,pricing,and lead-time quotation under lead-time and demand uncertainty[J].Production and Operations Management,2012,21(3):576-589.

[8] Tang CS.A review of marketing-operations interface models:From co-existence to coordination and collaboration[J].International Journal of Production Economics,2010,125(1):22-40.

[9] Eliashberg J,Steinberg R.Marketing-production decisions in an industrial channel of distribution[J].Management Science,1987,33(8):981-1000.

[10] Dewan S,Mendelson H.User delay costs and internal pricing for a service facility[J].Management Science,1990,36(12):1502-1517.

[11] Porteus E,Whang S.On manufacturing/marketing incentives[J].Management Science,1991,37(9):1166-1181.

[12] Kouvelis P,Lariviere M.Decentralizing cross-functional decisions:Coordination through internal markets[J].Management Science,2000,46(8):1049-1058.

[13] Kumar K R,Loomba A P S,Hadjinicola G C.Marketing-production coordination in channels of distribution[J].European Journal of Operational Research,2000,126(1):189-217.

[14] Li Qing,Atkins D.Coordinating replenishment and pricing in a firm[J].Manufacturing&Service Operations Management,2002,4(4):241-257.

[15] Balasubramanian S,Bhardwaj P.When not all conflict is bad:Manufacturing-marketing conflict and strategic incentive design[J].Management Science,2004,50(4):489-502.

[16] Pekgün P,Griffin PM,Keskinocak P.Coordination of marketing and production for price and leadtime decisions[J].ⅡE Transactions,2008,40(1):12-30.

[17] Petruzzi NC,Dada M.Pricing and the newsvendor problem:a review with extensions[J].Operations Research,1999,47(2):183-194.
Outlines

/